As prescribed in 45.106(a), insert the following clause in solicitations and contracts when the conditions in 45.105(b) exist and the Government maintains the Government’s official Government property records:
Property Records (Apr 1984)
The Government shall maintain the Government’s official property records in connection with Government property under this contract. The Government Property clause is hereby modified by deleting the requirement for the Contractor to maintain such records.
(End of clause)
As prescribed in 45.106(b)(1), insert the following clause:
Government Property (Fixed-Price Contracts) (May 2004)
(a) Government-furnished property.
(1) The Government shall deliver to the Contractor, for use in connection with and under the terms of this contract, the Government-furnished property described in the Schedule or specifications together with any related data and information that the Contractor may request and is reasonably required for the intended use of the property (hereinafter referred to as “Government-furnished property”).
(2) The delivery or performance dates for this contract are based upon the expectation that Government-furnished property suitable for use (except for property furnished “as is”) will be delivered to the Contractor at the times stated in the Schedule or, if not so stated, in sufficient time to enable the Contractor to meet the contract’s delivery or performance dates.
(3) If Government-furnished property is received by the Contractor in a condition not suitable for the intended use, the Contractor shall, upon receipt of it, notify the Contracting Officer, detailing the facts, and, as directed by the Contracting Officer and at Government expense, either repair, modify, return, or otherwise dispose of the property. After completing the directed action and upon written request of the Contractor, the Contracting Officer shall make an equitable adjustment as provided in paragraph (h) of this clause.
(4) If Government-furnished property is not delivered to the Contractor by the required time, the Contracting Officer shall, upon the Contractor’s timely written request, make a determination of the delay, if any, caused the Contractor and shall make an equitable adjustment in accordance with paragraph (h) of this clause.
(b) Changes in Government-furnished property.
(1) The Contracting Officer may, by written notice, (i) decrease the Government-furnished property provided or to be provided under this contract, or (ii) substitute other Government-furnished property for the property to be provided by the Government, or to be acquired by the Contractor for the Government, under this contract. The Contractor shall promptly take such action as the Contracting Officer may direct regarding the removal, shipment, or disposal of the property covered by such notice.
(2) Upon the Contractor’s written request, the Contracting Officer shall make an equitable adjustment to the contract in accordance with paragraph (h) of this clause, if the Government has agreed in the Schedule to make the property available for performing this contract and there is any—
(i) Decrease or substitution in this property pursuant to paragraph (b)(1) of this clause; or
(ii) Withdrawal of authority to use this property, if provided under any other contract or lease.
(c) Title in Government property.
(1) The Government shall retain title to all Government-furnished property.
(2) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (collectively referred to as “Government property”), are subject to the provisions of this clause. However, special tooling accountable to this contract is subject to the provisions of the Special Tooling clause and is not subject to the provisions of this clause. Title to Government property shall not be affected by its incorporation into or attachment to any property not owned by the Government, nor shall Government property become a fixture or lose its identity as personal property by being attached to any real property.
(3) Title to each item of facilities and special test equipment acquired by the Contractor for the Government under this contract shall pass to and vest in the Government when its use in performing this contract commences or when the Government has paid for it, whichever is earlier, whether or not title previously vested in the Government.
(4) If this contract contains a provision directing the Contractor to purchase material for which the Government will reimburse the Contractor as a direct item of cost under this contract—
(i) Title to material purchased from a vendor shall pass to and vest in the Government upon the vendor’s delivery of such material; and
(ii) Title to all other material shall pass to and vest in the Government upon—
(A) Issuance of the material for use in contract performance;
(B) Commencement of processing of the material or its use in contract performance; or
(C) Reimbursement of the cost of the material by the Government, whichever occurs first.
(d) Use of Government property. The Government property shall be used only for performing this contract, unless otherwise provided in this contract or approved by the Contracting Officer.
(e) Property administration.
(1) The Contractor shall be responsible and accountable for all Government property provided under this contract and shall comply with Federal Acquisition Regulation (FAR) Subpart 45.5, as in effect on the date of this contract.
(2) The Contractor shall establish and maintain a program for the use, maintenance, repair, protection, and preservation of Government property in accordance with sound industrial practice and the applicable provisions of Subpart 45.5 of the FAR.
(3) If damage occurs to Government property, the risk of which has been assumed by the Government under this contract, the Government shall replace the items or the Contractor shall make such repairs as the Government directs. However, if the Contractor cannot effect such repairs within the time required, the Contractor shall dispose of the property as directed by the Contracting Officer. When any property for which the Government is responsible is replaced or repaired, the Contracting Officer shall make an equitable adjustment in accordance with paragraph (h) of this clause.
(4) The Contractor represents that the contract price does not include any amount for repairs or replacement for which the Government is responsible. Repair or replacement of property for which the Contractor is responsible shall be accomplished by the Contractor at its own expense.
(f) Access. The Government and all its designees shall have access at all reasonable times to the premises in which any Government property is located for the purpose of inspecting the Government property.
(g) Risk of loss. Unless otherwise provided in this contract, the Contractor assumes the risk of, and shall be responsible for, any loss or destruction of, or damage to, Government property upon its delivery to the Contractor or upon passage of title to the Government under paragraph (c) of this clause. However, the Contractor is not responsible for reasonable wear and tear to Government property or for Government property properly consumed in performing this contract.
(h) Equitable adjustment. When this clause specifies an equitable adjustment, it shall be made to any affected contract provision in accordance with the procedures of the Changes clause. When appropriate, the Contracting Officer may initiate an equitable adjustment in favor of the Government. The right to an equitable adjustment shall be the Contractor’s exclusive remedy. The Government shall not be liable to suit for breach of contract for—
(1) Any delay in delivery of Government-furnished property;
(2) Delivery of Government-furnished property in a condition not suitable for its intended use;
(3) A decrease in or substitution of Government-furnished property; or
(4) Failure to repair or replace Government property for which the Government is responsible.
(i) Government property disposal. Except as provided in paragraphs (i)(1)(i), (i)(2), and (i)(8)(i) of this clause, the Contractor shall not dispose of Government property until authorized to do so by the Plant Clearance Officer.
(1) Scrap (to which the Government has obtained title under paragraph (c) of this clause).—
(i) Contractor with an approved scrap procedure.—
(A) The Contractor may dispose of scrap resulting from production or testing under this contract without Government approval. However, if the scrap requires demilitarization or is sensitive property, the Contractor shall submit the scrap on an inventory disposal schedule.
(B) For scrap from other than production or testing the Contractor may prepare scrap lists in lieu of inventory disposal schedules (provided such lists are consistent with the approved scrap procedures), except that inventory disposal schedules shall be submitted for scrap aircraft or aircraft parts and scrap that—
(1) Requires demilitarization;
(2) Is a classified item;
(3) Is generated from classified items;
(4) Contains hazardous materials or hazardous wastes;
(5) Contains precious metals; or
(6) Is dangerous to the public health, safety, or welfare.
(ii) Contractor without an approved scrap procedure. The Contractor shall submit an inventory disposal schedule for all scrap.
(2) Pre-disposal requirements. When the Contractor determines that a property item acquired or produced by the Contractor, to which the Government has obtained title under paragraph (c) of this clause, is no longer needed for performance of this contract, the Contractor, in the following order of priority:
(i) May purchase the property at the acquisition cost.
(ii) Shall make reasonable efforts to return unused property to the appropriate supplier at fair market value (less, if applicable, a reasonable restocking fee that is consistent with the supplier’s customary practices).
(iii) Shall list, on Standard Form 1428, Inventory Disposal Schedule, property that was not purchased under paragraph (i)(2)(i) of this clause, could not be returned to a supplier, or could not be used in the performance of other Government contracts.
(3) Inventory disposal schedules.—
(i) The Contractor shall use Standard Form 1428, Inventory Disposal Schedule, to identify—
(A) Government-furnished property that is no longer required for performance of this contract, provided the terms of another Government contract do not require the Government to furnish that property for performance of that contract; and
(B) Property acquired or produced by the Contractor, to which the Government has obtained title under paragraph (c) of this clause, that is no longer required for performance of that contract.
(ii) The Contractor may annotate inventory disposal schedules to identify property the Contractor wishes to purchase from the Government.
(iii) Unless the Plant Clearance Officer has agreed otherwise, or the contract requires electronic submission of inventory disposal schedules, the Contractor shall prepare separate inventory disposal schedules for—
(A) Special test equipment with commercial components;
(B) Special test equipment without commercial components;
(C) Printing equipment;
(D) Computers, components thereof, peripheral equipment, and related equipment;
(E) Precious Metals;
(F) Nonnuclear hazardous materials or hazardous wastes; or
(G) Nuclear materials or nuclear wastes.
(iv) Property with the same description, condition code, and reporting location may be grouped in a single line item. The Contractor shall describe special test equipment in sufficient detail to permit an understanding of the special test equipment’s intended use.
(4) Submission requirements. The Contractor shall submit inventory disposal schedules to the Plant Clearance Officer no later than—
(i) Thirty days following the Contractor’s determination that a Government property item is no longer required for performance of the contract;
(ii) Sixty days, or such longer period as may be approved by the Plant Clearance Officer, following completion of contract deliveries or performance; or
(iii) One hundred twenty days, or such longer period as may be approved by the Plant Clearance Officer, following contract termination in whole or in part.
(5) Corrections. The Plant Clearance Officer may require the Contractor to correct an inventory disposal schedule or may reject a schedule if the property identified on the schedule is not accountable under this contract or is not in the quantity or condition indicated.
(6) Postsubmission adjustments. The Contractor shall provide the Plant Clearance Officer at least 10 working days advance written notice of its intent to remove a property item from an approved inventory disposal schedule. Unless the Plant Clearance Officer objects to the intended schedule adjustment within the notice period, the Contractor may make the adjustment upon expiration of the notice period.
(7) Storage.—
(i) The Contractor shall store the property identified on an inventory disposal schedule pending receipt of disposal instructions. The Government’s failure to provide disposal instructions within 120 days following acceptance of an inventory disposal schedule might entitle the Contractor to an equitable adjustment for costs incurred to store such property on or after the 121st day.
(ii) The Contractor shall obtain the Plant Clearance Officer’s approval to remove Government property from the premises at which the property is currently located prior to receipt of final disposition instructions. If approval is granted, any costs incurred by the Contractor to transport or store the property shall not increase the price or fee of any Government contract. The storage facility shall be appropriate for assuring the property’s physical safety and suitability for use. Approval does not relieve the Contractor of any liability under this contract for such property.
(8) Disposition instructions.—
(i) If the Government does not provide disposition instructions to the Contractor within 45 days following acceptance of a scrap list, the Contractor may dispose of the listed scrap in accordance with the Contractor’s approved scrap procedures.
(ii) The Contractor shall prepare for shipment, deliver f.o.b. origin, or dispose of Government property as directed by the Plant Clearance Officer. The Contractor shall remove and destroy any markings identifying the property as Government property prior to disposing of the property.
(iii) The Contracting Officer may require the Contractor to demilitarize the property prior to shipment or disposal. Any equitable adjustment incident to the Contracting Officer’s direction to demilitarize Government property shall be made in accordance with paragraph (h) of this clause.
(9) Disposal proceeds. The Contractor shall credit the net proceeds from the disposal of Government property to the price or cost of work covered by this contract or to the Government as the Contracting Officer directs.
(10) Subcontractor inventory disposal schedules. The Contractor shall require a subcontractor that is using property accountable under this contract at a subcontractor-managed site to submit inventory disposal schedules to the Contractor in sufficient time for the Contractor to comply with the requirements of paragraph (i)(4) of this clause.
(j) Abandonment of Government property.—
(1) The Government will not abandon sensitive Government property without the Contractor’s written consent.
(2) The Government, upon notice to the Contractor, may abandon any nonsensitive Government property in place at which time all obligations of the Government regarding such abandoned property shall cease.
(3) The Government has no obligation to restore or rehabilitate the Contractor’s premises under any circumstances; however, if Government-furnished property is withdrawn or is unsuitable for the intended use, or if other Government property is substituted, then the equitable adjustment under paragraph (h) of this clause may properly include restoration or rehabilitation costs.
(k) Communications. All communications under this clause shall be in writing.
(l) Overseas contracts. If this contract is to be performed outside of the United States and its outlying areas, the words “Government” and “Government-furnished” (wherever they appear in this clause) shall be construed as “United States Government” and “United States Government-furnished,” respectively.
(End of clause)
Alternate I (Apr 1984). As prescribed in 45.106(b)(2), substitute the following paragraph (g) for paragraph (g) of the basic clause:
(g) Limited risk of loss. (1) The term “Contractor’s managerial personnel,” as used in this paragraph (g), means the Contractor’s directors, officers, and any of the Contractor’s managers, superintendents, or equivalent representatives who have supervision or direction of—
(i) All or substantially all of the Contractor’s business;
(ii) All or substantially all of the Contractor’s operation at any one plant or separate location at which the contract is being performed; or
(iii) A separate and complete major industrial operation connected with performing this contract.
(2) The Contractor shall not be liable for loss or destruction of, or damage to, the Government property provided under this contract (or, if an educational or nonprofit organization, for expenses incidental to such loss, destruction, or damage), except as provided in paragraphs (g)(3) and (g)(4) of this clause.
(3) The Contractor shall be responsible for loss or destruction of, or damage to, the Government property provided under this contract (including expenses incidental to such loss, destruction, or damage)—
(i) That results from a risk expressly required to be insured under this contract, but only to the extent of the insurance required to be purchased and maintained, or to the extent of insurance actually purchased and maintained, whichever is greater;
(ii) That results from a risk that is in fact covered by insurance or for which the Contractor is otherwise reimbursed, but only to the extent of such insurance or reimbursement;
(iii) For which the Contractor is otherwise responsible under the express terms of this contract;
(iv) That results from willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel; or
(v) That results from a failure on the part of the Contractor, due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel, to establish and administer a program or system for the control, use, protection, preservation, maintenance, and repair of Government property as required by paragraph (e) of this clause.
(4)(i) If the Contractor fails to act as provided in subdivision (g)(3)(v) of this clause, after being notified (by certified mail addressed to one of the Contractor’s managerial personnel) of the Government’s disapproval, withdrawal of approval, or nonacceptance of the system or program, it shall be conclusively presumed that such failure was due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel.
(ii) In such event, any loss or destruction of, or damage to, the Government property shall be presumed to have resulted from such failure unless the Contractor can establish by clear and convincing evidence that such loss, destruction, or damage—
(A) Did not result from the Contractor’s failure to maintain an approved program or system; or
(B) Occurred while an approved program or system was maintained by the Contractor.
(5) If the Contractor transfers Government property to the possession and control of a subcontractor, the transfer shall not affect the liability of the Contractor for loss or destruction of, or damage to, the property as set forth above. However, the Contractor shall require the subcontractor to assume the risk of, and be responsible for, any loss or destruction of, or damage to, the property while in the subcontractor’s possession or control, except to the extent that the subcontract, with the advance approval of the Contracting Officer, relieves the subcontractor from such liability. In the absence of such approval, the subcontract shall contain appropriate provisions requiring the return of all Government property in as good condition as when received, except for reasonable wear and tear or for its use in accordance with the provisions of the prime contract.
(6) Upon loss or destruction of, or damage to, Government property provided under this contract, the Contractor shall so notify the Contracting Officer and shall communicate with the loss and salvage organization, if any, designated by the Contracting Officer. With the assistance of any such organization, the Contractor shall take all reasonable action to protect the Government property from further damage, separate the damaged and undamaged Government property, put all the affected Government property in the best possible order, and furnish to the Contracting Officer a statement of—
(i) The lost, destroyed, or damaged Government property;
(ii) The time and origin of the loss, destruction, or damage;
(iii) All known interests in commingled property of which the Government property is a part; and
(iv) The insurance, if any, covering any part of or interest in such commingled property.
(7) The Contractor shall repair, renovate, and take such other action with respect to damaged Government property as the Contracting Officer directs. If the Government property is destroyed or damaged beyond practical repair, or is damaged and so commingled or combined with property of others (including the Contractor’s) that separation is impractical, the Contractor may, with the approval of and subject to any conditions imposed by the Contracting Officer, sell such property for the account of the Government. Such sales may be made in order to minimize the loss to the Government, to permit the resumption of business, or to accomplish a similar purpose. The Contractor shall be entitled to an equitable adjustment in the contract price for the expenditures made in performing the obligations under this paragraph (g)(7) in accordance with paragraph (h) of this clause. However, the Government may directly reimburse the loss and salvage organization for any of their charges. The Contracting Officer shall give due regard to the Contractor’s liability under this paragraph (g) when making such equitable adjustment.
(8) The Contractor represents that it is not including in the price and agrees it will not hereafter include in any price to the Government any charge or reserve for insurance (including any self-insurance fund or reserve) covering loss or destruction of, or damage to, Government property, except to the extent that the Government may have expressly required the Contractor to carry such insurance under another provision of this contract.
(9) In the event the Contractor is reimbursed or otherwise compensated for any loss or destruction of, or damage to, Government property, the Contractor shall use the proceeds to repair, renovate, or replace the lost, destroyed, or damaged Government property, or shall otherwise credit the proceeds to equitably reimburse the Government, as directed by the Contracting Officer.
(10) The Contractor shall do nothing to prejudice the Government’s rights to recover against third parties for any loss or destruction of, or damage to, Government property. Upon the request of the Contracting Officer, the Contractor shall, at the Government’s expense, furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery. In addition, where a subcontractor has not been relieved from liability for any loss or destruction of, or damage to, Government property, the Contractor shall enforce for the benefit of the Government the liability of the subcontractor for such loss, destruction, or damage.
Alternate II (June 2003). As prescribed in 45.106(b)(3), substitute the following paragraphs (c) and (g) for paragraphs (c) and (g) of the basic clause:
(c) Title in Government property. (1) The Government shall retain title to all Government-furnished property.
(2) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (collectively referred to as “Government property”), are subject to the provisions of this clause. Title to Government property shall not be affected by its incorporation into or attachment to any property not owned by the Government, nor shall Government property become a fixture or lose its identity as personal property by being attached to any real property.
(3) Title to each item of facilities, special test equipment, and special tooling (other than that subject to a special tooling clause) acquired by the Contractor for the Government under this contract shall pass to and vest in the Government when its use in performing this contract commences, or when the Government has paid for it, whichever is earlier, whether or not title previously vested in the Government.
(4) Title to equipment (and other tangible personal property) purchased with funds available for research and having an acquisition cost of less than $5,000 shall vest in the Contractor upon acquisition or as soon thereafter as feasible; provided, that the Contractor obtained the Contracting Officer’s approval before each acquisition. Title to equipment purchased with funds available for research and having an acquisition cost of $5,000 or more shall vest as set forth in the contract. If title to equipment vests in the Contractor under this paragraph (c)(4), the Contractor agrees that no charge will be made to the Government for any depreciation, amortization, or use under any existing or future Government contract or subcontract thereunder. The Contractor shall furnish the Contracting Officer a list of all equipment to which title is vested in the Contractor under this paragraph (c)(4) within 10 days following the end of the calendar quarter during which it was received.
(5) Vesting title under this paragraph (c) is subject to civil rights legislation, 42 U.S.C. 2000d. Before title is vested and by signing this contract, the Contractor accepts and agrees that—
“No person in the United States or its outlying areas shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under this contemplated financial assistance (title to equipment).”
(g) Limited risk of loss. (1) The term “Contractor’s managerial personnel,” as used in this paragraph (g), means the Contractor’s directors, officers, and any of the Contractor’s managers, superintendents, or equivalent representatives who have supervision or direction of—
(i) All or substantially all of the Contractor’s business;
(ii) All or substantially all of the Contractor’s operation at any one plant, laboratory, or separate location at which the contract is being performed; or
(iii) A separate and complete major industrial operation connected with performing this contract.
(2) The Contractor shall not be liable for loss or destruction of, or damage to, the Government property provided under this contract (or, if an educational or nonprofit organization, for expenses incidental to such loss, destruction, or damage), except as provided in paragraphs (g)(3) and (g)(4) of this clause.
(3) The contractor shall be responsible for loss or destruction of, or damage to, the Government property provided under this contract (including expenses incidental to such loss, destruction, or damage)—
(i) That results from a risk expressly required to be insured under this contract, but only to the extent of the insurance required to be purchased and maintained, or to the extent of insurance actually purchased and maintained, whichever is greater;
(ii) That results from a risk which is in fact covered by insurance or for which the Contractor is otherwise reimbursed, but only to the extent of such insurance or reimbursement;
(iii) For which the Contractor is otherwise responsible under the express terms of this contract;
(iv) That results from willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel; or
(v) That results from a failure on the part of the Contractor, due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel, to establish and administer a program or system for the control, use, protection, preservation, maintenance, and repair of Government property as required by paragraph (e) of this clause.
(4)(i) If the Contractor fails to act as provided in subdivision (g)(3)(v) of this clause, after being notified (by certified mail addressed to one of the Contractor’s managerial personnel) of the Government’s disapproval, withdrawal of approval, or nonacceptance of the system or program, it shall be conclusively presumed that such failure was due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel.
(ii) Furthermore, any loss or destruction of, or damage to, the Government property shall be presumed to have resulted from such failure unless the Contractor can establish by clear and convincing evidence that such loss, destruction, or damage—
(A) Did not result from the Contractor’s failure to maintain an approved program or system; or
(B) Occurred while an approved program or system was maintained by the Contractor.
(5) If the Contractor transfers Government property to the possession and control of a subcontractor, the transfer shall not affect the liability of the Contractor for loss or destruction of, or damage to, the property as set forth above. However, the Contractor shall require the subcontractor to assume the risk of, and be responsible for, any loss or destruction of, or damage, to the property while in the subcontractor’s possession or control, except to the extent that the subcontract, with the advance approval of the Contracting Officer, relieves the subcontractor from such liability. In the absence of such approval, the subcontract shall contain appropriate provisions requiring the return of all Government property in as good condition as when received, except for reasonable wear and tear or for its use in accordance with the provisions of the prime contract.
(6) Upon loss or destruction of, or damage to, Government property provided under this contract, the Contractor shall so notify the Contracting Officer and shall communicate with the loss and salvage organization, if any, designated by the Contracting Officer. With the assistance of any such organization, the Contractor shall take all reasonable action to protect the Government property from further damage, separate the damaged and undamaged Government property, put all the affected Government property in the best possible order, and furnish to the Contracting Officer a statement of—
(i) The lost, destroyed, or damaged Government property;
(ii) The time and origin of the loss, destruction, or damage;
(iii) All known interests in commingled property of which the Government property is a part; and
(iv) The insurance, if any, covering any part of or interest in such commingled property.
(7) The Contractor shall repair, renovate, and take such other action with respect to damaged Government property as the Contracting Officer directs. If the Government property is destroyed or damaged beyond practical repair, or is damaged and so commingled or combined with property of others (including the Contractor’s) that separation is impractical, the Contractor may, with the approval of and subject to any conditions imposed by the Contracting Officer, sell such property for the account of the Government. Such sales may be made in order to minimize the loss to the Government, to permit the resumption of business, or to accomplish a similar purpose. The Contractor shall be entitled to an equitable adjustment in the contract price for the expenditures made in performing the obligations under this paragraph (g)(7) in accordance with paragraph (h) of this clause. However, the Government may directly reimburse the loss and salvage organization for any of their charges. The Contracting Officer shall give due regard to the Contractor’s liability under this paragraph (g) when making any such equitable adjustment.
(8) The Contractor represents that it is not including in the price, and agrees it will not hereafter include in any price to the Government, any charge or reserve for insurance (including any self-insurance fund or reserve) covering loss or destruction of, or damage to, Government property, except to the extent that the Government may have expressly required the Contractor to carry such insurance under another provision of this contract.
(9) In the event the Contractor is reimbursed or otherwise compensated for any loss or destruction of, or damage to, the Government property, the Contractor shall use the proceeds to repair, renovate, or replace the lost, destroyed, or damaged Government property or shall otherwise credit the proceeds to or equitably reimburse the Government, as directed by the Contracting Officer.
(10) The Contractor shall do nothing to prejudice the Government's rights to recover against third parties for any loss or destruction of, or damage to, Government property. Upon the request of the Contracting Officer, the Contractor shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery. In addition, where a subcontractor has not been relieved from liability for any loss or destruction of, or damage to, Government property, the Contractor shall enforce for the benefit of the Government the liability of the subcontractor for such loss, destruction, or damage.
As prescribed in 45.106(c), insert the following clause, in addition to the clause at 52.245-2, Government Property (Fixed-Price Contracts), in solicitations and contracts when a fixed-price construction contract is contemplated under which the Government is to furnish Government property f.o.b. railroad cars at a specified destination or f.o.b. truck at the project site. The contract Schedule shall specify the point of delivery and may include special terms and conditions covering installation, preparation for operation, or equipment testing by the Government or by another contractor.
Identification of Government-Furnished Property (Apr 1984)
(a) The Government will furnish to the Contractor the property identified in the Schedule to be incorporated or installed into the work or used in performing the contract. The listed property will be furnished f.o.b. railroad cars at the place specified in the contract Schedule or f.o.b. truck at the project site. The Contractor is required to accept delivery, pay any demurrage or detention charges, and unload and transport the property to the job site at its own expense. When the property is delivered, the Contractor shall verify its quantity and condition and acknowledge receipt in writing to the Contracting Officer. The Contractor shall also report in writing to the Contracting Officer within 24 hours of delivery any damage to or shortage of the property as received. All such property shall be installed or incorporated into the work at the expense of the Contractor, unless otherwise indicated in this contract.
(b) Each item of property to be furnished under this clause shall be identified in the Schedule by quantity, item, and description.
(End of clause)
As prescribed in 45.106(d), insert the following clause:
Government-Furnished Property (Short Form) (June 2003)
(a) The Government shall deliver to the Contractor, at the time and locations stated in this contract, the Government-furnished property described in the Schedule or specifications. If that property, suitable for its intended use, is not delivered to the Contractor, the Contracting Officer shall equitably adjust affected provisions of this contract in accordance with the Changes clause when—
(1) The Contractor submits a timely written request for an equitable adjustment; and
(2) The facts warrant an equitable adjustment.
(b) Title to Government-furnished property shall remain in the Government. The Contractor shall use the Government-furnished property only in connection with this contract. The Contractor shall maintain adequate property control records in accordance with sound industrial practice and will make such records available for Government inspection at all reasonable times, unless the clause at Federal Acquisition Regulation 52.245-1, Property Records, is included in this contract.
(c) Upon delivery of Government-furnished property to the Contractor, the Contractor assumes the risk and responsibility for its loss or damage, except—
(1) For reasonable wear and tear;
(2) To the extent property is consumed in performing this contract; or
(3) As otherwise provided for by the provisions of this contract.
(d) Upon completing this contract, the Contractor shall follow the instructions of the Contracting Officer regarding the disposition of all Government-furnished property not consumed in performing this contract or previously delivered to the Government. The Contractor shall prepare for shipment, deliver f.o.b. origin, or dispose of the Government property, as may be directed or authorized by the Contracting Officer. The net proceeds of any such disposal shall be credited to the contract price or shall be paid to the Government as directed by the Contracting Officer.
(e) If this contract is to be performed outside the Untied States and its outlying areas, the words “Government” and “Government-furnished” (wherever they appear in this clause) shall be construed as “United States Government” and “United States Government-furnished,” respectively.
(End of clause)
As prescribed in 45.106(f)(1), insert the following clause:
Government Property (Cost-Reimbursement, Time-and-Material, or Labor-Hour Contracts) (May 2004)
(a) Government-furnished property.
(1) The term “Contractor’s managerial personnel,” as used in paragraph (g) of this clause, means any of the Contractor’s directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of—
(i) All or substantially all of the Contractor’s business;
(ii) All or substantially all of the Contractor’s operation at any one plant, or separate location at which the contract is being performed; or
(iii) A separate and complete major industrial operation connected with performing this contract.
(2) The Government shall deliver to the Contractor, for use in connection with and under the terms of this contract, the Government-furnished property described in the Schedule or specifications, together with such related data and information as the Contractor may request and as may be reasonably required for the intended use of the property (hereinafter referred to as “Government-furnished property”).
(3) The delivery or performance dates for this contract are based upon the expectation that Government-furnished property suitable for use will be delivered to the Contractor at the times stated in the Schedule or, if not so stated, in sufficient time to enable the Contractor to meet the contract’s delivery or performance dates.
(4) If Government-furnished property is received by the Contractor in a condition not suitable for the intended use, the Contractor shall, upon receipt, notify the Contracting Officer, detailing the facts, and, as directed by the Contracting Officer and at Government expense, either effect repairs or modification or return or otherwise dispose of the property. After completing the directed action and upon written request of the Contractor, the Contracting Officer shall make an equitable adjustment as provided in paragraph (h) of this clause.
(5) If Government-furnished property is not delivered to the Contractor by the required time or times, the Contracting Officer shall, upon the Contractor’s timely written request, make a determination of the delay, if any, caused the Contractor and shall make an equitable adjustment in accordance with paragraph (h) of this clause.
(b) Changes in Government-furnished property.
(1) The Contracting Officer may, by written notice, (i) decrease the Government-furnished property provided or to be provided under this contract or (ii) substitute other Government-furnished property for the property to be provided by the Government or to be acquired by the Contractor for the Government under this contract. The Contractor shall promptly take such action as the Contracting Officer may direct regarding the removal, shipment, or disposal of the property covered by this notice.
(2) Upon the Contractor’s written request, the Contracting Officer shall make an equitable adjustment to the contract in accordance with paragraph (h) of this clause, if the Government has agreed in the Schedule to make such property available for performing this contract and there is any—
(i) Decrease or substitution in this property pursuant to paragraph (b)(1) of this clause; or
(ii) Withdrawal of authority to use property, if provided under any other contract or lease.
(c) Title.
(1) The Government shall retain title to all Government-furnished property.
(2) Title to all property purchased by the Contractor for which the Contractor is entitled to be reimbursed as a direct item of cost under this contract shall pass to and vest in the Government upon the vendor’s delivery of such property.
(3) Title to all other property, the cost of which is reimbursable to the Contractor, shall pass to and vest in the Government upon—
(i) Issuance of the property for use in contract performance;
(ii) Commencement of processing of the property for use in contract performance; or
(iii) Reimbursement of the cost of the property by the Government, whichever occurs first.
(4) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (collectively referred to as “Government property”), are subject to the provisions of this clause. Title to Government property shall not be affected by its incorporation into or attachment to any property not owned by the Government, nor shall Government property become a fixture or lose its identity as personal property by being attached to any real property.
(d) Use of Government property. The Government property shall be used only for performing this contract, unless otherwise provided in this contract or approved by the Contracting Officer.
(e) Property administration.
(1) The Contractor shall be responsible and accountable for all Government property provided under the contract and shall comply with Federal Acquisition Regulation (FAR) Subpart 45.5, as in effect on the date of this contract.
(2) The Contractor shall establish and maintain a program for the use, maintenance, repair, protection, and preservation of Government property in accordance with sound business practice and the applicable provisions of FAR Subpart 45.5.
(3) If damage occurs to Government property, the risk of which has been assumed by the Government under this contract, the Government shall replace the items or the Contractor shall make such repairs as the Government directs. However, if the Contractor cannot effect such repairs within the time required, the Contractor shall dispose of the property as directed by the Contracting Officer. When any property for which the Government is responsible is replaced or repaired, the Contracting Officer shall make an equitable adjustment in accordance with paragraph (h) of this clause.
(f) Access. The Government and all its designees shall have access at all reasonable times to the premises in which any Government property is located for the purpose of inspecting the Government property.
(g) Limited risk of loss.
(1) The Contractor shall not be liable for loss or destruction of, or damage to, the Government property provided under this contract or for expenses incidental to such loss, destruction, or damage, except as provided in paragraphs (g)(2) and (g)(3) of this clause.
(2) The Contractor shall be responsible for loss or destruction of, or damage to, the Government property provided under this contract (including expenses incidental to such loss, destruction, or damage)—
(i) That results from a risk expressly required to be insured under this contract, but only to the extent of the insurance required to be purchased and maintained or to the extent of insurance actually purchased and maintained, whichever is greater;
(ii) That results from a risk that is in fact covered by insurance or for which the Contractor is otherwise reimbursed, but only to the extent of such insurance or reimbursement;
(iii) For which the Contractor is otherwise responsible under the express terms of this contract;
(iv) That results from willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel; or
(v) That results from a failure on the part of the Contractor, due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel, to establish and administer a program or system for the control, use, protection, preservation, maintenance, and repair of Government property as required by paragraph (e) of this clause.
(3)(i) If the Contractor fails to act as provided by subdivision (g)(2)(v) of this clause, after being notified (by certified mail addressed to one of the Contractor’s managerial personnel) of the Government’s disapproval, withdrawal of approval, or nonacceptance of the system or program, it shall be conclusively presumed that such failure was due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel.
(ii) In such event, any loss or destruction of, or damage to, the Government property shall be presumed to have resulted from such failure unless the Contractor can establish by clear and convincing evidence that such loss, destruction, or damage—
(A) Did not result from the Contractor’s failure to maintain an approved program or system; or
(B) Occurred while an approved program or system was maintained by the Contractor.
(4) If the Contractor transfers Government property to the possession and control of a subcontractor, the transfer shall not affect the liability of the Contractor for loss or destruction of, or damage to, the property as set forth above. However, the Contractor shall require the subcontractor to assume the risk of, and be responsible for, any loss or destruction of, or damage to, the property while in the subcontractor’s possession or control, except to the extent that the subcontract, with the advance approval of the Contracting Officer, relieves the subcontractor from such liability. In the absence of such approval, the subcontract shall contain appropriate provisions requiring the return of all Government property in as good condition as when received, except for reasonable wear and tear or for its use in accordance with the provisions of the prime contract.
(5) Upon loss or destruction of, or damage to, Government property provided under this contract, the Contractor shall so notify the Contracting Officer and shall communicate with the loss and salvage organization, if any, designated by the Contracting Officer. With the assistance of any such organization, the Contractor shall take all reasonable action to protect the Government property from further damage, separate the damaged and undamaged Government property, put all the affected Government property in the best possible order, and furnish to the Contracting Officer a statement of—
(i) The lost, destroyed, or damaged Government property;
(ii) The time and origin of the loss, destruction, or damage;
(iii) All known interests in commingled property of which the Government property is a part; and
(iv) The insurance, if any, covering any part of or interest in such commingled property.
(6) The Contractor shall repair, renovate, and take such other action with respect to damaged Government property as the Contracting Officer directs. If the Government property is destroyed or damaged beyond practical repair, or is damaged and so commingled or combined with property of others (including the Contractor’s) that separation is impractical, the Contractor may, with the approval of and subject to any conditions imposed by the Contracting Officer, sell such property for the account of the Government. Such sales may be made in order to minimize the loss to the Government, to permit the resumption of business, or to accomplish a similar purpose. The Contractor shall be entitled to an equitable adjustment in the contract price for the expenditures made in performing the obligations under this paragraph (g)(6) in accordance with paragraph (h) of this clause. However, the Government may directly reimburse the loss and salvage organization for any of their charges. The Contracting Officer shall give due regard to the Contractor’s liability under this paragraph (g) when making any such equitable adjustment.
(7) The Contractor shall not be reimbursed for, and shall not include as an item of overhead, the cost of insurance or of any reserve covering risk of loss or destruction of, or damage to, Government property, except to the extent that the Government may have expressly required the Contractor to carry such insurance under another provision of this contract.
(8) In the event the Contractor is reimbursed or otherwise compensated for any loss or destruction of, or damage to, Government property, the Contractor shall use the proceeds to repair, renovate, or replace the lost, destroyed, or damaged Government property or shall otherwise credit the proceeds to, or equitably reimburse, the Government, as directed by the Contracting Officer.
(9) The Contractor shall do nothing to prejudice the Government’s rights to recover against third parties for any loss or destruction of, or damage to, Government property. Upon the request of the Contracting Officer, the Contractor shall, at the Government’s expense, furnish to the Government all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery. In addition, where a subcontractor has not been relieved from liability for any loss or destruction of, or damage to, Government property, the Contractor shall enforce for the benefit of the Government the liability of the subcontractor for such loss, destruction, or damage.
(h) Equitable adjustment. When this clause specifies an equitable adjustment, it shall be made to any affected contract provision in accordance with the procedures of the Changes clause. When appropriate, the Contracting Officer may initiate an equitable adjustment in favor of the Government. The right to an equitable adjustment shall be the Contractor’s exclusive remedy. The Government shall not be liable to suit for breach of contract for—
(1) Any delay in delivery of Government-furnished property;
(2) Delivery of Government-furnished property in a condition not suitable for its intended use;
(3) A decrease in or substitution of Government-furnished property; or
(4) Failure to repair or replace Government property for which the Government is responsible.
(i) Government property disposal. Except as provided in paragraphs (i)(1)(i), (i)(2), and (i)(8)(i) of this clause, the Contractor shall not dispose of Government property until authorized to do so by the Plant Clearance Officer.
(1) Scrap.
(i) Contractor with an approved scrap procedure.
(A) The Contractor may dispose of scrap resulting from production or testing under this contract without Government approval. However, if the scrap requires demilitarization or is sensitive property, the Contractor shall submit the scrap on an inventory disposal schedule.
(B) For scrap from other than production or testing, the Contractor may prepare scrap lists in lieu of inventory disposal schedules (provided such lists are consistent with the approved scrap procedures), except that inventory disposal schedules shall be submitted for scrap aircraft or aircraft parts and scrap that—
(1) Requires demilitarization;
(2) Is a classified item;
(3) Is generated from classified items;
(4) Contains hazardous materials or hazardous wastes;
(5) Contains precious metals; or
(6) Is dangerous to the public health, safety, or welfare.
(ii) Contractor without an approved scrap procedure. The Contractor shall submit an inventory disposal schedule for all scrap.
(2) Pre-disposal requirements. When the Contractor determines that a property item acquired or produced by the Contractor, to which the Government has obtained title under paragraph (c) of this clause, is no longer needed for performance of this contract, the Contractor, in the following order of priority:
(i) May purchase the property at the acquisition cost.
(ii) Shall make reasonable efforts to return unused property to the appropriate supplier at fair market value (less, if applicable, a reasonable restocking fee that is consistent with the supplier’s customary practices).
(iii) Shall list, on Standard Form 1428, Inventory Disposal Schedule, property that was not purchased under paragraph (i)(2)(i) of this clause, could not be returned to a supplier, or could not be used in the performance of other Government contracts.
(3) Inventory disposal schedules.
(i) The Contractor shall use Standard Form 1428, Inventory Disposal Schedule, to identify—
(A) Government-furnished property that is no longer required for performance of this contract, provided the terms of another Government contract do not require the Government to furnish that property for performance of that contract; and
(B) Property acquired or produced by the Contractor, to which the Government has obtained title under paragraph (c) of this clause, that is no longer required for performance of that contract.
(ii) The Contractor may annotate inventory disposal schedules to identify property the Contractor wishes to purchase from the Government.
(iii) Unless the Plant Clearance Officer has agreed otherwise, or the contract requires electronic submission of inventory disposal schedules, the Contractor shall prepare separate inventory disposal schedules for—
(A) Special test equipment with commercial components;
(B) Special test equipment that does not contain commercial components;
(C) Printing equipment;
(D) Computers, components thereof, peripheral equipment, and related equipment;
(E) Precious Metals;
(F) Nonnuclear hazardous materials or hazardous wastes; or
(G) Nuclear materials or nuclear wastes.
(iv) Property with the same description, condition code, and reporting location may be grouped in a single line item. The Contractor shall describe special test equipment in sufficient detail to permit an understanding of the special test equipment’s intended use.
(4) Submission requirements. The Contractor shall submit inventory disposal schedules to the Plant Clearance Officer no later than—
(i) Thirty days following the Contractor’s determination that a Government property item is no longer required for performance of the contract;
(ii) Sixty days, or such longer period as may be approved by the Plant Clearance Officer, following completion of contract deliveries or performance; or
(iii) One hundred twenty days, or such longer period as may be approved by the Plant Clearance Officer, following contract termination in whole or in part.
(5) Corrections. The Plant Clearance Officer may require the Contractor to correct an inventory disposal schedule or may reject a schedule if the property identified on the schedule is not accountable under this contract or is not in the quantity or condition indicated.
(6) Postsubmission adjustments. The Contractor shall provide the Plant Clearance Officer at least 10 working days advance written notice of its intent to remove a property item from an approved inventory disposal schedule. Unless the Plant Clearance Officer objects to the intended schedule adjustment within the notice period, the Contractor may make the adjustment upon expiration of the notice period.
(7) Storage.
(i) The Contractor shall store the property identified on an inventory disposal schedule pending receipt of disposal instructions. The Government’s failure to provide disposal instructions within 120 days following acceptance of an inventory disposal schedule, might entitle the Contractor to an equitable adjustment for costs incurred to store such property on or after the 121st day.
(ii) The Contractor shall obtain the Plant Clearance Officer’s approval to remove Government property from the premises at which the property is currently located prior to receipt of final disposition instructions. If approval is granted, any costs incurred by the Contractor to transport or store the property shall not increase the price or fee of any Government contract. The storage facility must be appropriate for assuring the property’s physical safety and suitability for use. Approval does not relieve the Contractor of any liability under this contract for such property.
(8) Disposition instructions.
(i) If the Government does not provide disposition instructions to the Contractor within 45 days following acceptance of a scrap list, the Contractor may dispose of the listed scrap in accordance with the Contractor’s approved scrap procedures.
(ii) The Contractor shall prepare for shipment, deliver f.o.b. origin, or dispose of Government property as directed by the Plant Clearance Officer. The Contractor shall remove and destroy any markings identifying the property as Government property prior to disposing of the property.
(iii) The Contracting Officer may require the Contractor to demilitarize the property prior to shipment or disposal. Any equitable adjustment incident to the Contracting Officer’s direction to demilitarize Government property shall be made in accordance with paragraph (h) of this clause.
(9) Disposal proceeds. The Contractor shall credit the net proceeds from the disposal of Government property to the cost of work covered by this contract, or to the Government as directed by the Contracting Officer.
(10) Subcontractor inventory disposal schedules. The Contractor shall require a subcontractor that is using property accountable under this contract at a subcontractor-managed site to submit inventory disposal schedules to the Contractor in sufficient time for the Contractor to comply with the requirements of paragraph (i)(4) of this clause.
(j) Abandonment of Government property.
(1) The Government will not abandon sensitive Government property without the Contractor’s written consent;
(2) The Government, upon notice to the Contractor, may abandon any nonsensitive Government property in place at which time all obligations of the Government regarding such abandoned property shall cease.
(3) The Government has no obligation to restore or rehabilitate the Contractor’s premises under any circumstances; however, if Government-furnished property is withdrawn or is unsuitable for the intended use, or if other Government property is substituted, then the equitable adjustment under paragraph (h) of this clause may properly include restoration or rehabilitation costs.
(k) Communications. All communications under this clause shall be in writing.
(l) Overseas contracts. If this contract is to be performed outside the United States and its outlying areas, the words “Government” and “Government-furnished” (wherever they appear in this clause) shall be construed as “United States Government” and “United States Government-furnished,” respectively.
(End of clause)
Alternate I (June 2003). As prescribed in 45.106(f)(2)), substitute the following paragraph (c) for paragraph (c) of the basic clause:
(c) Title. (1) The Government shall retain title to all Government-furnished property.
(2) All Government-furnished property and all property acquired by the Contractor, title to which vests in the Government under this paragraph (collectively referred to as “Government property”), are subject to the provisions of this clause. Title to Government property shall not be affected by its incorporation into or attachment to any property not owned by the Government, nor shall Government property become a fixture or lose its identity as personal property by being attached to any real property.
(3) Title to all property purchased by the Contractor for which the Contractor is entitled to be reimbursed as a direct item of cost under this contract and that, under the provisions of this contract is to vest in the Government, shall pass to and vest in the Government upon the vendor’s delivery of such property. Title to all other property, the cost of which is to be reimbursed to the Contractor under this contract and that under the provisions of this contract is to vest in the Government, shall pass to and vest in the Government upon—
(i) Issuance of the property for use in contract performance;
(ii) Commencement of processing of the property or its use in contract performance; or
(iii) Reimbursement of the cost of the property by the Government, whichever occurs first.
(4) Title to equipment (and other tangible personal property) purchased with funds available for research and having an acquisition cost of less than $5,000 shall vest in the Contractor upon acquisition or as soon thereafter as feasible; provided, that the Contractor obtained the Contracting Officer’s approval before each acquisition. Title to equipment purchased with funds available for research and having an acquisition cost of $5,000 or more shall vest as set forth in the contract. If title to equipment vests in the Contractor under this paragraph (c)(4), the Contractor agrees that no charge will be made to the Government for any depreciation, amortization, or use under any existing or future Government contract or subcontract thereunder. The Contractor shall furnish the Contracting Officer a list of all equipment to which title is vested in the Contractor under this paragraph (c)(4) within 10 days following the end of the calendar quarter during which it was received.
(5) Vesting title under this paragraph (c) is subject to civil rights legislation, 42 U.S.C. 2000d. Before title is vested and by signing this contract, the Contractor accepts and agrees that—
“No person in the United States or its outlying areas shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under this contemplated financial assistance (title to equipment).”
As prescribed in 45.106(g) insert the following clause, in addition to the clauses prescribed at 37.304, in solicitations and contracts for dismantling, demolition, or removal of improvements:
Liability for Government Property (Demolition Services Contracts) (Apr 1984)
Except for reasonable wear and tear incident to removal and delivery to the Government, the Contractor assumes the risk of and shall be responsible for any loss or destruction of, or damage to, items of property, title to which—
(a) Remains in the Government and that are to be delivered to the Government by the Contractor in performing the work; and
(b) Is vested in the Contractor but that under the Termination clauses of this contract is revested in the Government upon notice of termination.
(End of clause)
As prescribed in 45.302-6(a), insert the following clause in solicitations and contracts when a consolidated facilities contract is contemplated:
Government Property (Consolidated Facilities) (Mar 1996)
(a) Definitions. For the purpose of this contract, the following definitions apply:
“Facilities,” as used in this clause, means all property provided under this facilities contract.
“Related contract,” as used in this clause, means a Government contract or subcontract for supplies or services under which the use of the facilities is or may be authorized.
(b) Facilities to be provided.
(1) The Contractor, at Government expense and subject to the provisions of this contract, shall acquire, construct, or install the facilities and perform the related work as described in the Schedule.
(2) The Government, subject to the provisions of this contract, shall furnish to the Contractor the facilities identified in the Schedule as Government-furnished facilities. The Contractor, at Government expense, shall perform the work with respect to those facilities as is described in the Schedule.
(3) All shipments of the facilities shall be made on Government bills of lading, unless otherwise authorized by the Contracting Officer. The required number of such Government bills of lading will be furnished to the Contractor by, and the Contractor shall be accountable therefor to, the transportation activity designated by the Contracting Officer.
(c) Period of this contract. If not otherwise specified in the contract and if not previously terminated under paragraph (m), the use of the facilities authorized under this contract shall terminate 5 years after its effective date. Thereafter, if continued use of the facilities by the Contractor is mutually desired, the parties shall enter into a new contract that shall incorporate such provisions as may then be required by applicable laws and regulations. The parties may, by written agreement, extend the use of the facilities under this contract beyond this 5-year period to permit the completion of any then-existing related contracts and subcontracts.
(d) Title in the facilities.
(1) The Government shall retain title to all Government-furnished property.
(2) Title to all facilities and components shall pass to and vest in the Government upon delivery by the vendor of all such items purchased by the Contractor for which it is entitled to be reimbursed as a direct item of cost under this contract.
(3) Title to replacement parts furnished by the Contractor in carrying out its normal maintenance obligations under paragraph (h) shall pass to and vest in the Government upon completion of their installation in the facilities.
(4) Title to other property, the cost of which is reimbursable to the Contractor under this contract, shall pass to and vest in the Government upon—
(i) Issuance of the property for use in performing this contract;
(ii) Commencement of processing or use of the property in performing this contract; or
(iii) Reimbursement of the cost of the property by the Government, whichever occurs first.
(5) Title to the facilities shall not be affected by their incorporation into or attachment to any property not owned by the Government, nor shall any item of the facilities become a fixture or lose its identity as personal property by being attached to any real property. The Contractor shall keep the facilities free and clear of all liens and encumbrances and, except as otherwise authorized by this contract or by the Contracting Officer, shall not remove or otherwise part with possession of, or permit the use by others of, any of the facilities.
(6) The Contractor may, with the written approval of the Contracting Officer, install, arrange, or rearrange, on Government-furnished premises, readily movable machinery, equipment, and other items belonging to the Contractor. Title to any such item shall remain in the Contractor even though it may be attached to real property owned by the Government, unless the Contracting Officer determines that it is so permanently attached that removal would cause substantial injury to Government property.
(7) The Contractor shall not construct or install, at its own expense, any fixed improvement or structural alterations in Government buildings or other real property without advance written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property, that, after completion, cannot be removed without substantial loss of value or damage to the premises. The term does not include foundations for production equipment.
(e) Location of the facilities. The Contractor may use the facilities at any of the locations specified in the Schedule and, with the prior written approval of the Contracting Officer, at any other location. In granting this approval, the Contracting
Officer may prescribe such terms and conditions as may be deemed necessary for protecting the Government’s interest in the facilities involved. Those terms and conditions shall take precedence over any conflicting provisions of this contract.
(f) Notice of use of the facilities. The Contractor shall notify the Contracting Officer in writing—
(1) Whenever use of all facilities for Government work in any quarterly period averages less than 75 percent of the total use of the facilities; or
(2) Whenever any item of the facilities is no longer needed or usable for performing existing related contracts that authorize such use.
(g) Property control. The Contractor shall maintain property control procedures and records and a system of identification of the facilities, in accordance with the provisions of Federal Acquisition Regulation (FAR) Subpart 45.5 in effect on the date of this contract. The provisions of FAR 45.5 are hereby incorporated by reference and made a part of this contract.
(h) Maintenance.
(1) Except as otherwise provided in the Schedule, the Contractor shall perform normal maintenance of the facilities in accordance with sound industrial practice, including protection, preservation, and repair of the facilities and normal parts replacement for equipment.
(2) As soon as practicable after the execution of this contract, the Contractor shall submit to the Contracting Officer a written proposed maintenance program, including a maintenance records system, in sufficient detail to show its adequacy. If the Contracting Officer agrees to the proposed program, it shall become the normal maintenance obligation of the Contractor. The Contractor’s performance according to the approved program shall satisfy the Contractor’s obligations under paragraphs (h)(1) and (h)(5) of this clause.
(3) The Contracting Officer may at any time direct the Contractor in writing to reduce the work required by the normal maintenance program. If such order reduces the cost of performing the maintenance, an appropriate equitable adjustment may be made in any affected related contract that so provides.
(4) The Contractor shall perform any maintenance work directed by the Contracting Officer in writing. Work in excess of the maintenance required under paragraphs (h)(1) through (h)(3) of this clause shall be at Government expense. The Contractor shall notify the Contracting Officer in writing when sound industrial practice requires maintenance in excess of the normal maintenance program.
(5) The Contractor shall keep records of all work done on the facilities and shall give the Government reasonable opportunity to inspect these records. When facilities are disposed of under this contract, the Contractor shall deliver the related records to the Government or, if the Contracting Officer directs, to third persons.
(6) The Contractor’s obligation under this clause for each item of facilities shall continue until the item is removed, abandoned, or disposed of; until the expiration of the 120-day period stated in paragraph (n)(4) of this clause; and until the Contractor has discharged its other obligations under this contract with respect to such items.
(i) Access. The Government and any persons designated by it shall, at all reasonable times, have access to the premises where any of the facilities are located.
(j) Indemnification of the Government. The Contractor shall indemnify the Government and hold it harmless against claims for injury to persons or damage to property of the Contractor or others arising from the Contractor’s possession or use of the facilities, except as specified in the clause at FAR 52.228-7, Insurance—Liability to Third Persons. However, the provisions of the Contractor’s related contracts shall govern any assumption of liability by the Government for claims arising under those contracts.
(k) Late delivery, diversion, and substitution.
(1) The Government shall not be liable for breach of contract for any delay in delivery or nondelivery of facilities to be furnished under this contract.
(2) The Government has the right, at its expense, to divert the facilities under this contract by directing the Contractor to—
(i) Deliver any of the facilities to locations other than those specified in the Schedule; or
(ii) Assign purchase orders or subcontracts for any of the facilities to the Government or third parties.
(3) The Government may furnish any facilities instead of having the Contractor acquire or construct them. In such event, the Contractor is entitled to reimbursement for the cost related to the acquisition or construction of the facilities, including the cost of terminating purchase orders and subcontracts.
(4) Appropriate equitable adjustment may be made in any related contract that so provides and that is affected by any nondelivery, delay, diversion, or substitution under this paragraph (k).
(l) Representations and warranties.
(1) The Government makes no warranty, express or implied, regarding the condition or fitness for use of any facilities. To the extent practical, the Contractor shall be allowed to inspect all the facilities to be furnished by the Government before their shipment.
(2) If the Contractor receives facilities in a condition not suitable for the intended use, the Contractor shall, within 30 days after receipt and installation thereof, so notify the Contracting Officer, detailing the facts and, as directed by the Contracting Officer and at Government expense, either (i) return such item or otherwise dispose of it or (ii) effect repairs or modifications. An appropriate equitable adjustment may be made in any related contract that so provides and that is affected by the return, disposition, repair, or modification of any facilities.
(m) Termination of the use of the facilities.
(1) The Contractor may at any time, upon written notice to the Contracting Officer, terminate its authority to use any or all of the facilities. Termination under this paragraph (m) shall not relieve the Contractor of any of its obligations or liabilities under any related contract or subcontract affected by the termination.
(2) The Contracting Officer may at any time, upon written notice, terminate or limit the Contractor’s authority to use any of the facilities. Except as otherwise provided in the Failure to Perform clause of this contract, an equitable adjustment may be made in any related contract of the Contractor that so provides and that is affected by such notice.
(n) Disposition of the facilities.
(1) The provisions of this paragraph (n) shall apply to facilities for which use has been terminated by either the Contracting Officer or the Contractor under paragraph (m), except as provided in paragraph (n)(2).
(2) Unless otherwise directed by the Contracting Officer, this paragraph shall not apply to facilities terminated by the Contractor if—
(i) The facilities terminated do not comprise all of the facilities in the possession of the Contractor; and
(ii) The Contracting Officer determines that continued retention of the facilities will not interfere with the Contractor’s operations.
(3) Within 60 days after the effective date of any notice of termination given under paragraph (m), or within such longer period as the Contracting Officer may approve in writing, the Contractor shall submit to the Contracting Officer, in a form satisfactory to the Contracting Officer, an accounting for all the facilities covered by the notice.
(4) Within 120 days after the Contractor accounts for any facilities under paragraph (n)(3), the Contracting Officer shall give written notice to the Contractor as to the disposition of the facilities, except as otherwise provided in paragraph (n)(6). In its disposition of the facilities, the Government may either—
(i) Abandon the facilities in place, in which case all obligations of the Government regarding such abandoned facilities and the restoration or rehabilitation of the premises in and on which they are located shall immediately cease; or
(ii) Require the Contractor to comply, at Government expense, with such directions as the Contracting Officer may give with respect to—
(A) The preparation, protection, removal, or shipment of the affected facilities;
(B) The retention or storage of the affected facilities; provided, that the Contracting Officer shall not direct the Contractor to retain or store any items of facilities in or on real property not owned by the Government if such retention or storage will interfere with the Contractor’s operations;
(C) The restoration of Government-owned property incident to the removal of the facilities from such property; and
(D) The sale of any affected facilities in such manner, at such times, and at such price as may be approved by the Government, except that the Contractor shall not be required to extend credit to any purchaser.
(5) If the Contracting Officer fails to give the written notice required by paragraph (n)(4) within the prescribed 120-day period, the Contractor may, upon not less than 30 days’ written notice to the Government and at Government risk and expense, (i) retain the facilities in place or (ii) remove any of the affected severable facilities located in Contractor-owned property and store them at the Contractor’s plant or in a public insured warehouse, in accordance with sound practice and in a manner compatible with their security classification. Except as provided in this paragraph, the Government shall not be liable to the Contractor for failure to give the written notice required by paragraph (n)(4).
(6) Nonseverable items of the facilities or items of the facilities subject to patent or proprietary rights shall be disposed of in such manner as the parties may have agreed to in writing.
(7) The Government, either directly or by third persons engaged by it, may remove or otherwise dispose of any facilities for which the Contractor’s authority to use has been terminated, other than those for which specific provision is made in paragraph (n)(6).
(8) The Contractor shall, within a reasonable time after the expiration of the 120-day period specified in paragraph (n)(4), remove all of its property from the Government property and take such action as the Contracting Officer may direct in writing with respect to restoring that Government property (to the extent that it is affected by the installation of the Contractor’s property) to its condition before such installation.
(9) Unless otherwise specifically provided in this contract, the Government shall not be obligated to the Contractor to restore or rehabilitate any property at the Contractor’s plant, except for restoration or rehabilitation costs caused by removal of the facilities under subdivision (n)(4)(ii). The Contractor agrees to indemnify the Government against all suits or claims for damages arising out of the Government’s failure to restore or rehabilitate any property at the Contractor’s plant or property of its subcontractors, except any damage as may be caused by the negligence of the Government, its agents, or independent contractors.
(End of clause)
As prescribed in 45.302-6(b), insert the following clause:
Liability for the Facilities (Jan 1997)
(a) The term “Contractor’s managerial personnel,” as used in this clause, means any of the Contractor’s directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of—
(1) All or substantially all of the Contractor’s business;
(2) All or substantially all of the Contractor’s operations at any one plant or separate location in which the facilities are installed or located; or
(3) A separate and complete major industrial operation in connection with which the facilities are used.
(b) The Contractor shall not be liable for any loss or destruction of, or damage to, the facilities or for expenses incidental to such loss, destruction, or damage, except as provided in this clause.
(c) The Contractor shall be liable for loss or destruction of, or damage to, the facilities, and for expenses incidental to such loss, destruction, or damage—
(1) That results from a risk expressly required to be insured under this contract, but only to the extent of the insurance required to be purchased and maintained, or to the extent of insurance actually purchased and maintained, whichever is greater;
(2) That results from a risk that is in fact covered by insurance or for which the Contractor is otherwise reimbursed, but only to the extent of such insurance or reimbursement;
(3) For which the Contractor is otherwise responsible under the express terms of this contract;
(4) That results from willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel; or
(5) That results from a failure, due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel—
(i) To establish, maintain, and administer a system for control of the facilities in accordance with the “Property administration” paragraph of the Government Property clause; or
(ii) To maintain and administer a program for maintenance, repair, protection, and preservation of the facilities, in accordance with the “Property administration” paragraph of the Government Property clause, or to take reasonable steps to comply with any appropriate written direction that the Contracting Officer may prescribe as reasonably necessary for the protection of the facilities. If the Government Property clause does not include the “Property administration” paragraph, then the Contractor shall exercise sound industrial practice in complying with the requirements of this subdivision (c)(5)(ii).
(d)(1) If the Contractor fails to act as provided by paragraph (c)(5) of this clause, after being notified (by certified mail addressed to one of the Contractor’s managerial personnel) of the Government’s disapproval, withdrawal of approval, or nonacceptance of the system or program, it shall be conclusively presumed that such failure was due to willful misconduct or lack of good faith on the part of the Contractor’s managerial personnel.
(2) Furthermore, any loss or destruction of, or damage to, the Government property shall be presumed to have resulted from such failure unless the Contractor can establish by clear and convincing evidence that such loss, destruction, or damage—
(i) Did not result from the Contractor’s failure to maintain an approved program or system; or
(ii) Occurred while an approved program or system was maintained by the Contractor.
(e) If the Contractor transfers facilities to the possession and control of a subcontractor, the transfer shall not affect the liability of the Contractor for loss or destruction of, or damage to, the facilities. However, the Contractor shall require the subcontractor to assume the risk of, and be responsible for, any loss or destruction of, or damage to, the facilities while in the subcontractor’s possession or control, except to the extent that the subcontract, with the advance approval of the Contracting Officer, relieves the subcontractor from such liability. In the absence of such approval, the subcontract shall contain appropriate provisions requiring the return of all the facilities in as good condition as when received, except for reasonable wear and tear or for their utilization in accordance with the provisions of the prime contract.
(f) Unless expressly directed in writing by the Contracting Officer, the Contractor shall not include in the price or cost under any contract with the Government the cost of insurance (including self-insurance) against any form of loss, destruction, or damage to the facilities. Any insurance required under this clause shall be in such form, in such amounts, for such periods of time, and with such insurers (including the Contractor as self-insurer in appropriate circumstances) as the Contracting Officer shall require or approve. Such insurance shall provide for 30 days advance notice to the Contracting Officer, in the event of cancellation or material change in the policy coverage on the part of the insurer. Documentation of insurance or an authenticated copy of such insurance shall be deposited promptly with the Contracting Officer. The Contractor shall, not less than 30 days before the expiration of such insurance, deliver to the Contracting Officer documentation of insurance or an authenticated copy of each renewal policy. The insurance shall be in the name of the United States of America (Agency Name), the Contractor, and such other interested parties as the Contracting Officer shall approve, and shall contain a loss payable clause reading substantially as follows:
Any loss under this policy shall be adjusted with (Contractor) and the proceeds, at the direction of the Government, shall be paid to (Contractor). Proceeds not paid to (Contractor) shall be paid to the office designated by the Contracting Officer.
(g) When there is any loss or destruction of, or damage to, the facilities—
(1) The Contractor shall promptly notify the Contracting Officer and, with the assistance of the Contracting Officer, shall take all reasonable steps to protect the facilities from further damage, separate the damaged and undamaged facilities, put all the facilities in the best possible order, and promptly furnish to the Contracting Officer (and in any event within 30 days) a statement of—
(i) The facilities lost or damaged;
(ii) The time and origin of the loss or damage;
(iii) All known interests in commingled property of which the facilities are a part; and
(iv) Any insurance covering any part of or interest in such commingled property;
(2) The Contractor shall make such repairs, replacements and renovations of the lost, destroyed, or damaged facilities, or take such other action as the Contracting Officer may direct in writing; and
(3) The Contractor shall perform its obligations under this paragraph (g) at Government expense, except to the extent that the Contractor is liable for such damage, destruction, or loss under the terms of this clause, and except as any damage, destruction, or loss is compensated by insurance.
(h) The Government is not obliged to replace or repair the facilities that have been lost, destroyed, or damaged. If the Government does not replace or repair the facilities, the right of the parties to an equitable adjustment in delivery or performance dates, price, or both, and in any other contractual condition of the related contracts affected shall be governed by the terms and conditions of those contracts.
(i) Except to the extent of any loss or destruction of, or damage to, the facilities for which the Contractor is relieved of liability, the facilities shall be returned to the Government or otherwise disposed of under the terms of this contract—
(1) In as good condition as when received by the Contractor;
(2) Improved; or
(3) As required under the terms of this contract, less ordinary wear and tear.
(j) If the Contractor is in any way compensated (excepting proceeds from use and occupancy insurance, the cost of which is not borne directly or indirectly by the Government) for any loss or destruction of, or damage to, the facilities, the Contractor, as directed by the Contracting Officer, shall—
(1) Use the proceeds to repair, renovate, or replace the facilities involved; or
(2) Pay such proceeds to the Government.
(k) The Contractor shall do nothing to prejudice the Government’s right to recover against third parties for any loss or destruction of, or damage to, the facilities. Upon the request of the Contracting Officer, the Contractor shall furnish to the Government, at Government expense, all reasonable assistance and cooperation (including the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.
(End of clause)
As prescribed in 45.106(h), insert the following clause:
Use and Charges (Aug 2005)
(a) Definitions. As used in this clause:
“Acquisition cost” means the acquisition cost recorded in the Contractor’s property control system or, in the absence of such record, the value attributed by the Government to a Government property item for purposes of determining a reasonable rental charge.
“Government property” means all property owned by or leased to the Government or acquired by the Government under the terms of the contract. It includes both Government-furnished property and contractor-acquired property as defined in FAR 45.101.
“Real property” means land and rights in land, ground improvements, utility distribution systems, and buildings and other structures. It does not include foundations and other work necessary for installing special tooling, special test equipment, or equipment.
“Rental period” means the calendar period during which Government property is made available for nongovernmental purposes.
“Rental time” means the number of hours, to the nearest whole hour, rented property is actually used for nongovernmental purposes. It includes time to set up the property for such purposes, perform required maintenance, and restore the property to its condition prior to rental (less normal wear and tear).
(b) Use of Government property. The Contractor may use the Government property without charge in the performance of—
(1) Contracts with the Government that specifically authorize such use without charge;
(2) Subcontracts of any tier under Government prime contracts if the Contracting Officer having cognizance of the prime contract—
(i) Approves a subcontract specifically authorizing such use; or
(ii) Otherwise authorizes such use in writing; and
(3) Other work, if the Contracting Officer specifically authorizes in writing use without charge for such work.
(c) Rental. If granted written permission by the Contracting Officer, or if it is specifically provided for in the Schedule, the Contractor may use the Government property (except material) for a rental fee for work other than that provided in paragraph (b) of this clause. Authorizing such use of the Government property does not waive any rights of the Government to terminate the Contractor’s right to use the Government property. The rental fee shall be determined in accordance with the following paragraphs.
(d) General.
(1) Rental requests shall be submitted to the Administrative Contracting Officer (ACO), identify the property for which rental is requested, propose a rental period, and compute an estimated rental charge by using the Contractor’s best estimate of rental time in the formulae described in paragraph (e) of this clause.
(2) The Contractor shall not use Government property for nongovernmental purposes, including Independent Research and Development, until a rental charge for real property, or estimated rental charge for other property, is agreed upon. Rented property shall be used only on a non-interference basis.
(e) Rental charge.—
(1) Real property and associated fixtures.
(i) The Contractor shall obtain, at its expense, a property appraisal from an independent licensed, accredited, or certified appraiser that computes a monthly, daily, or hourly rental rate for comparable commercial property. The appraisal may be used to compute rentals under this clause throughout its effective period or, if an effective period is not stated in the appraisal, for one year following the date the appraisal was performed. The Contractor shall submit the appraisal to the ACO at least 30 days prior to the date the property is needed for nongovernmental use. Except as provided in paragraph (e)(1)(iii) of this clause, the ACO shall use the appraisal rental rate to determine a reasonable rental charge.
(ii) Rental charges shall be determined by multiplying the rental time by the appraisal rental rate expressed as a rate per hour. Monthly or daily appraisal rental rates shall be divided by 720 or 24, respectively, to determine an hourly rental rate.
(iii) When the ACO believes the appraisal rental rate is unreasonable, the ACO shall promptly notify the Contractor. The parties may agree on an alternative means for computing a reasonable rental charge.
(iv) The Contractor shall obtain, at its expense, additional property appraisals in the same manner as provided in paragraph (e)(1)(i) if the effective period has expired and the Contractor desires the continued use of property for nongovernmental use. The Contractor may obtain additional appraisals within the effective period of the current appraisal if the market prices decrease substantially.
(2) Other Government property. The Contractor may elect to compute the rental charge using the appraisal method described in paragraph (e)(1) of this clause subject to the constraints therein or the following formula in which rental time shall be expressed in increments of not less than one hour with portions of hours rounded to the next higher hour: The rental charge is calculated by multiplying 2 percent of the acquisition cost by the hours of rental time, and dividing by 720.
(3) Alternative methodology. The Contractor may request consideration of an alternative basis for computing the rental charge if it considers the monthly rental rate or a time-based rental unreasonable or impractical.
(f) Rental payments.
(1) Rent is due 60 days following completion of the rental period or as otherwise specified in the contract. The Contractor shall compute the rental due, and furnish records or other supporting data in sufficient detail to permit the ACO to verify the rental time and computation. Payment shall be made by check payable to the Treasurer of the United States and sent to the contract administration office identified in this contract, unless otherwise specified by the Contracting Officer.
(2) Interest will be charged if payment is not made by the date specified in paragraph (f)(1) of this clause. Interest will accrue at the “Renegotiation Board Interest Rate” (published in the Federal Register semiannually on or about January 1st and July 1st) for the period in which the rent is due.
(3) The Government’s acceptance of any rental payment under this clause, in whole or in part, shall not be construed as a waiver or relinquishment of any rights it may have against the Contractor stemming from the Contractor’s unauthorized use of Government property or any other failure to perform this contract according to its terms.
(g) Use revocation. At any time during the rental period, the Government may revoke nongovernmental use authorization and require the Contractor, at the Contractor’s expense, to return the property to the Government, restore the property to its pre-rental condition (less normal wear and tear), or both.
(h) Unauthorized use. The unauthorized use of Government property can subject a person to fines, imprisonment, or both, under 18 U.S.C. 641.
(End of clause)
As prescribed in 45.302-6(c), insert the following clause in solicitations and contracts when a facilities acquisition contract is contemplated:
Government Property (Facilities Acquisition) (Mar 1996)
(a) Definitions.
“Facilities,” as used in this clause, means all property provided under this facilities contract.
“Related contract,” as used in this clause, means a Government contract or subcontract for supplies or services under which the use of the facilities is or may be authorized.
(b) Facilities to be provided.
(1) The Contractor, at Government expense and subject to the provisions of this contract, shall acquire, construct, or install the facilities and perform the related work as described in the Schedule.
(2) The Government, subject to the provisions of this contract, shall furnish to the Contractor the facilities identified in the Schedule as Government-furnished facilities. The Contractor, at Government expense, shall perform the work with respect to those Government-furnished facilities as is described in the Schedule.
(c) Title in the facilities.
(1) The Government shall retain title to all Government-furnished property.
(2) Title to all facilities and components shall pass to and vest in the Government upon delivery by the vendor of all such items purchased by the Contractor for which it is entitled to be reimbursed as a direct item of cost under this contract.
(3) Title to other property, the cost of which is reimbursable to the Contractor under this contract, shall pass to and vest in the Government upon—
(i) Issuance of the property for use in performing this contract;
(ii) Commencement of processing or use of the property in performing this contract; or
(iii) Reimbursement of the cost of the property by the Government, whichever occurs first.
(4) Title to the facilities shall not be affected by their incorporation into, or attachment to, any property not owned by the Government, nor shall any item of the facilities become a fixture or lose its identity as personal property by being attached to any real property. The Contractor shall keep the facilities free and clear of all liens and encumbrances and, except as otherwise authorized by this contract or by the Contracting Officer, shall not remove or otherwise part with possession of, or permit the use by others of, any of the facilities.
(5) The Contractor may, with the written approval of the Contracting Officer, install, arrange, or rearrange, on Government-furnished premises, readily movable machinery, equipment, and other items belonging to the Contractor. Title to any such item shall remain in the Contractor even though it may be attached to real property owned by the Government, unless the Contracting Officer determines that it is so permanently attached that removal would cause substantial injury to Government property.
(6) The Contractor shall not construct or install, at its own expense, any fixed improvement or structural alterations in Government buildings or other real property without advance written approval of the Contracting Officer. Fixed improvement, or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property, that, after completion, cannot be removed without substantial loss of value or damage to the premises. The term does not include foundations for production equipment.
(d) Property control. The Contractor shall maintain property control procedures and records and a system of identification of the facilities in accordance with the provisions of Federal Acquisition Regulation (FAR) Subpart 45.5 in effect on the date of this contract. The provisions of FAR 45.5 are hereby incorporated by reference and made a part of this contract.
(e) Access. The Government and any persons designated by it shall, at all reasonable times, have access to the premises where any of the facilities are located.
(f) Indemnification of the Government. The Contractor shall indemnify the Government and hold it harmless against claims for injury to persons or damage to property of the Contractor or others arising from the Contractor’s possession or use of the facilities, except as specified in the clause at FAR 52.228-7, Insurance—Liability to Third Persons. However, the provisions of the Contractor’s related contracts shall govern any assumption of liability by the Government for claims arising under such related contracts.
(g) Late delivery, diversion, and substitution.
(1) The Government shall not be liable for breach of contract for any delay in delivery or nondelivery of facilities to be furnished under this contract.
(2) The Government has the right, at its expense, to divert the facilities under this contract by directing the Contractor to—
(i) Deliver any of the facilities to locations other than those specified in the Schedule; or
(ii) Assign purchase orders or subcontracts for any of the facilities to the Government or third parties.
(3) The Government may furnish any facilities instead of having the Contractor acquire or construct them. In such event, the Contractor is entitled to reimbursement for the cost related to the acquisition or construction of the facilities, including the cost of terminating purchase orders and subcontracts.
(4) Appropriate equitable adjustment may be made in any related contract that so provides and that is affected by nondelivery, delay, diversion, or substitution under this paragraph (g).
(h) Representations and warranties.
(1) The Government makes no warranty, express or implied, regarding the condition or fitness for use of any facilities. To the extent practical, the Contractor shall be allowed to inspect all the facilities to be furnished by the Government before their shipment.
(2) If the Contractor receives facilities in a condition not suitable for the intended use, the Contractor shall, within 30 days after receipt and installation thereof, so notify the Contracting Officer, detailing the facts, and, as directed by the Contracting Officer and at Government expense, either (i) return such item or otherwise dispose of it or (ii) effect repairs or modifications. An appropriate equitable adjustment may be made in any related contract that so provides and that is affected by the return, disposition, repair, or modification of any facilities.
(i) Supersedure. Upon acquisition, construction, or installation of the facilities called for by this contract, or any usable increment of the facilities, and acceptance by the Government, the facilities shall then be subject to the provisions of the facilities contract that authorizes the use of the items.
(End of clause)
As prescribed in 45.302-6(d)(1), insert the following clause:
Government Property (Facilities Use) (Apr 1984)
(a) Definitions.
“Facilities,” as used in this clause, means property provided under this facilities contract.
“Related contract,” as used in this clause, means a Government contract or subcontract for supplies or services under which the use of the facilities is or may be authorized.
(b) Period of this contract. If not otherwise specified in this contract and if not previously terminated under paragraph (k), the use of the facilities authorized under this contract shall terminate 5 years after its effective date. Thereafter, if continued use of the facilities by the Contractor is mutually desired, the parties shall enter into a new contract that shall incorporate such provisions as may then be required by applicable laws and regulations. The parties may, by written agreement, extend the use of the facilities under this contract beyond this 5-year period to permit the completion of any then-existing related contracts and subcontracts.
(c) Title in the facilities.
(1) Title to the facilities shall remain in the Government. Title to parts replaced by the Contractor in carrying out its normal maintenance obligations under paragraph (g) shall pass to and vest in the Government upon completion of their installation in the facilities.
(2) Title to the facilities shall not be affected by their incorporation into or attachment to any property not owned by the Government, nor shall any item of the facilities become a fixture or lose its identity as personal property by being attached to any real property. The Contractor shall keep the facilities free and clear of all liens and encumbrances and, except as otherwise authorized by this contract or by the Contracting Officer, shall not remove or otherwise part with possession of, or permit the use by others of, any of the facilities.
(3) The Contractor may, with the written approval of the Contracting Officer, install, arrange, or rearrange, on Government-furnished premises, readily movable machinery, equipment, and other items belonging to the Contractor. Title to any such item shall remain in the Contractor even though it may be attached to real property owned by the Government, unless the Contracting Officer determines that it is so permanently attached that removal would cause substantial injury to Government property.
(4) The Contractor shall not construct or install, at its own expense, any fixed improvement or structural alterations in Government buildings or other real property without advance written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. The term does not include foundations for production equipment.
(d) Location of the facilities. The Contractor may use the facilities at any of the locations specified in the Schedule and, with the prior written approval of the Contracting Officer, at any other location. In granting this approval, the Contracting Officer may prescribe such terms and conditions as may be deemed necessary for protecting the Government’s interest in the facilities involved. Those terms and conditions shall take precedence over any conflicting provisions of this contract.
(e) Notice of use of the facilities. The Contractor shall notify the Contracting Officer in writing—
(1) Whenever use of all facilities for Government work in any quarterly period averages less than 75 percent of the total use of the facilities; or
(2) Whenever any item of the facilities is no longer needed or usable for performing existing related contracts that authorize such use.
(f) Property control. The Contractor shall maintain property control procedures and records, and a system of identification of the facilities, in accordance with the provisions of Federal Acquisition Regulation (FAR) Subpart 45.5 in effect on the date of this contract. The provisions of FAR 45.5 are hereby incorporated by reference and made a part of this contract.
(g) Maintenance.
(1) Except as otherwise provided in the Schedule, the Contractor shall protect, preserve, maintain (including normal parts replacement), and repair the facilities in accordance with sound industrial practice.
(2) As soon as practicable after the execution of this contract, the Contractor shall submit to the Contracting Officer a written proposed maintenance program, including a maintenance records system, in sufficient detail to show the adequacy of the proposed program. If the Contracting Officer agrees to the proposed program, it shall become the normal maintenance obligation of the Contractor. The Contractor’s performance according to the approved program shall satisfy the Contractor’s obligations under paragraphs (g)(1) and (g)(5) of this clause.
(3) The Contracting Officer may at any time direct the Contractor in writing to reduce the work required by the normal maintenance program. If such order reduces the cost of performing the maintenance, an appropriate equitable adjustment may be made in any affected related contract that so provides.
(4) The Contractor shall perform any maintenance work directed by the Contracting Officer in writing. Work in excess of the maintenance required under paragraphs (g)(1) through (g)(3) of this clause shall be at Government expense. The Contractor shall notify the Contracting Officer in writing when sound industrial practice requires maintenance in excess of the normal maintenance program.
(5) The Contractor shall keep records of all work done on the facilities and shall give the Government reasonable opportunity to inspect such records. When facilities are disposed of under this contract, the Contractor shall deliver the related records to the Government or, if directed by the Contracting Officer, to third persons.
(6) The Contractor’s obligation under this clause for each item of facilities shall continue until the item is removed, abandoned, or disposed of at the expiration of the 120-day period stated in paragraph (1)(4) of this clause and when the Contractor has discharged its other obligations under this contract with respect to such items.
(h) Access. The Government and any persons designated by it shall, at all reasonable times, have access to the premises where any of the facilities are located.
(i) Indemnification of the Government. The Contractor shall indemnify the Government and hold it harmless against claims for injury to persons or damage to property of the Contractor or others arising from the Contractor’s possession or use of the facilities under this contract. However, the provisions of the Contractor’s related contracts shall govern any assumption of liability by the Government for claims arising under those contracts.
(j) Representations and warranties.
(1) The Government makes no warranty, express or implied, regarding the condition or fitness for use of any facilities. To the extent practical, the Contractor shall be allowed to inspect all the facilities to be furnished by the Government before their shipment.
(2) If the Contractor receives facilities in a condition not suitable for the intended use, the Contractor shall, within 30 days after receipt and installation thereof, so notify the Contracting Officer, detailing the facts, and, as directed by the Contracting Officer and at Government expense, either (i) return such item or otherwise dispose of it or (ii) effect repairs or modifications. An appropriate equitable adjustment may be made in any related contract that so provides and that is affected by the return, disposition, repair, or modification of any facilities.
(k) Termination of use of the facilities.
(1) The Contractor may at any time, upon written notice to the Contracting Officer, terminate its authority to use any or all of the facilities. Termination under this paragraph (k) shall not relieve the Contractor of any of its obligations or liabilities under any related contract or subcontract affected by the termination.
(2) The Contracting Officer may at any time, upon written notice, terminate or limit the Contractor’s authority to use any of the facilities. Except as otherwise provided in the Failure to Perform clause of this contract, an equitable adjustment may be made in any related contract of the Contractor that so provides and that is affected by such notice.
(l) Disposition of the facilities.
(1) The provisions of this paragraph (1) shall apply to facilities whose use has been terminated by either the Contracting Officer or the Contractor under paragraph (k), except as provided in paragraph (1)(2).
(2) Unless otherwise directed by the Contracting Officer, this paragraph (1) shall not apply to facilities terminated by the Contractor if—
(i) The facilities terminated do not comprise all of the facilities in the possession of the Contractor; and
(ii) The Contracting Officer determines that continued retention of the facilities will not interfere with the Contractor’s operations.
(3) Within 60 days after the effective date of any notice of termination given under paragraph (k) or within such longer period as the Contracting Officer may approve in writing, the Contractor shall submit to the Contracting Officer an accounting for all the facilities covered by such notice. The submission of the Contractor shall be in a form satisfactory to the Contracting Officer.
(4) Within 120 days after the Contractor accounts for any facilities under paragraph (1)(3), the Contracting Officer shall give written notice to the Contractor as to the disposition of the facilities, except as otherwise provided in paragraph (1)(6). In its disposition of the facilities, the Government may either—
(i) Abandon the facilities in place, in which case all obligations of the Government regarding such abandoned facilities and the rehabilitation of the premises in and on which they are located shall immediately cease; or
(ii) Require the Contractor to comply, at Government expense, with such directions as the Contracting Officer may give with respect to—
(A) The preparation, protection, removal, or shipment of the affected facilities;
(B) The retention or storage of the affected facilities; provided, that the Contracting Officer shall not direct the Contractor to retain or store any items of facilities in or on real property not owned by the Government if such retention or storage will interfere with the Contractor’s operations;
(C) The restoration of Government-owned property incident to the removal of the facilities from such property; and
(D) The sale of any affected facilities in such manner, at such times, and at such price as may be approved by the Government, except that the Contractor shall not be required to extend credit to any purchaser.
(5) If the Contracting Officer fails to give the written notice required by paragraph (1)(4) of this clause within the prescribed 120-day period, the Contractor may, upon not less than 30 days’ written notice to the Government, and at Government risk and expense, (i) retain the facilities in place or (ii) remove any of the affected severable facilities located in Contractor-owned property and store them at the Contractor’s plant or in a public insured warehouse. Such removal and storage shall be in accordance with sound practice and in a manner compatible with the security classification of the facilities. Except as provided in this paragraph (1)(5), the Government shall not be liable to the Contractor for failure to give the written notice required by paragraph (1)(4).
(6) Nonseverable items of the facilities or items of the facilities subject to patent or proprietary rights shall be disposed of in such manner as the parties may have agreed to in writing.
(7) The Government, either directly or by third persons engaged by it, may remove or otherwise dispose of any facilities for which the Contractor’s authority to use has been terminated, other than those for which specific provision is made in paragraph (1)(6).
(8) The Contractor shall, within a reasonable time after the expiration of the 120-day period specified in paragraph (1)(4), remove all of its property from the Government property and take such action as the Contracting Officer may direct in writing with respect to restoring such Government property, to the extent that it is affected by the installation of the Contractor’s property, to its condition before such installation.
(9) Unless otherwise specifically provided in this contract, the Government shall not be obligated to the Contractor to restore or rehabilitate any property at the Contractor’s plant, except for restoration or rehabilitation costs caused by removal of the facilities under subdivision (1)(4)(ii). The Contractor agrees to indemnify the Government against all suits or claims for damages arising out of the Government’s failure to restore or rehabilitate any property at the Contractor’s plant or property of its subcontractors, except any damage as may be caused by the negligence of the Government, its agents, or independent contractors.
(m) Supersedure.
(1) Facilities previously provided to the Contractor under the contracts specified in the Schedule of this contract shall become subject to this contract upon its effective date. The terms of those contracts by which such facilities were previously provided to the Contractor are hereby superseded with respect to such facilities, except for rights and obligations that may have accrued under such other contract before the effective date of this contract.
(2) Facilities subsequently provided the Contractor under any contract shall, if that contract so specifies, be subject to this contract upon the completion of their construction, acquisition, and installation or upon their availability for use, whichever occurs first, except as otherwise provided in the contract or other document by which such facilities are provided to the Contractor.
(End of clause)
Alternate I (June 2003). As prescribed in 45.302-6(e)(2), substitute the following paragraph (c) for paragraph (c) of the basic clause:
(c) Title. (1) Title to equipment (and other tangible personal property) having a unit acquisition cost of less than $5,000 purchased with funds available for research shall vest in the Contractor upon acquisition or as soon thereafter as feasible, provided that the Contractor received the Contracting Officer’s approval before acquiring the equipment. Title to other equipment purchased with Government funds shall vest in the Government. The Government may at any time during the term of this contract or upon its completion or termination transfer to the Contractor the title to any equipment purchased with funds available for research. Any such transfer shall be upon terms and conditions agreed to by the parties. The Contractor agrees that it shall not charge under any Government contract or subcontract any depreciation, amortization, or use of the equipment purchased or transferred under this paragraph. When title to equipment is vested in the Contractor or is transferred under this paragraph to the Contractor, the equipment ceases to be Government property. Within 10 days after the end of the calendar quarter in which such acquisition or transfer of title occurs, the Contractor shall furnish the Contracting Officer a list of all equipment, title to which is vested in the Contractor.
(2)(i) The Government shall retain title to all Government-furnished property.
(ii) Except as set forth in paragraph (c)(1), title to all property shall pass to and vest in the Government upon delivery by the vendor of all such items purchased by the Contractor for which it is entitled to be reimbursed as a direct item of cost under this or a related contract.
(iii) Title to replacement parts furnished by the Contractor in performing its normal obligations under paragraph (g) shall pass to and vest in the Government upon completion of their installation in the facilities.
(iv) Title to other property, the cost of which is reimbursable to the contractor under this contract or a related contract, shall pass to and vest in the Government upon—
(A) Issuance of the property for use in performing this contract;
(B) Commencement of processing or use of the property in performing this contract; or
(C) Reimbursement of the cost of the property by the Government, whichever occurs first.
(3) Title to the facilities shall not be affected by their incorporation into or attachment to any property not owned by the Government, nor shall any item of the facilities become a fixture or lose its identity as personal property by being attached to any real property. The Contractor shall keep the facilities free and clear of all liens and encumbrances and, except as otherwise authorized by this contract or by the Contracting Officer, shall not remove or otherwise part with possession of, or permit the use by others of, any of the facilities.
(4) The Contractor may, with the written approval of the Contracting Officer, install, arrange, or rearrange, on Government-furnished premises, readily movable machinery, equipment, and other items belonging to the Contractor. Title to any such item shall remain in the Contractor even though it may be attached to real property owned by the Government, unless the Contracting Officer determines that it is so permanently attached that removal would cause substantial injury to Government property.
(5) The Contractor shall not construct or install, at its own expense, any fixed improvement or structural alterations in Government buildings or other real property without advance written approval of the Contracting Officer. Fixed improvement, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. The term does not include foundations for production equipment.
(6) Vesting title under this paragraph (c) is subject to civil rights legislation, 42 U.S.C. 2000d. Before title is vested and by signing this contract, the Contractor accepts and agrees that—
“No person in the United States or its outlying areas shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under this contemplated financial assistance (title to equipment).”
As prescribed in 45.302-7(a), the contracting officer may insert the following clause in solicitations and contracts when a facilities use contract is contemplated and award may be made to a nonprofit educational institution:
Contract Purpose (Nonprofit Educational Institutions) (Apr 1984)
This facilities use contract is designed specifically for nonprofit educational institutions to set forth provisions for the use and accountability of facilities furnished or acquired under related contracts identified elsewhere herein. There are no funds provided under this contract. Costs incurred for acquisition, maintenance, repair, replacement, disposition, or other purposes in connection with the facilities accountable hereunder will be subject to the reimbursement provisions of the related contracts; provided, however, that should no other contract be available for reimbursement of such costs, this contract may be appropriately modified to provide for such reimbursement.
(End of clause)
As prescribed in 45.302-7(b), the contracting officer may insert the following clause in solicitations and contracts when a facilities contract is contemplated and award may be made to a nonprofit educational institution:
Accountable Facilities (Nonprofit Educational Institutions) (Apr 1984)
The facilities accountable under this contract are those facilities furnished or acquired under this contract and those facilities furnished or acquired under those related contracts that are specifically identified in this contract Schedule.
(End of clause)
As prescribed in 45.302-7(c), the contracting officer may insert the following clause in solicitations and contracts when a facilities use contract is contemplated and award may be made to a nonprofit educational institution:
Use of Government Facilities (Apr 1984)
The Contractor may use the facilities without charge in performing—
(a) Contracts with the Government which specifically authorize such use without charge;
(b) Subcontracts of any tier if the Contracting Officer having cognizance of the prime contract has authorized, in writing, use without charge; and
(c) Other work for which the Contracting Officer has specifically authorized use without charge in writing.
(End of clause)
As prescribed in 45.302-7(d), insert the following clause:
Transfer of Title to the Facilities (June 2003)
(a) The Contracting Officer may, at any time during the term of this contract and acting under Public Law 97-258 (31 U.S.C. 6306), transfer title to equipment to the Contractor upon mutually agreeable terms and conditions. This clause takes precedence over the title paragraph of the Government property clause of this contract. However, every agreement to transfer title to equipment shall provide that the Contractor will not include in the contract price or charge the Government in any manner for depreciation, amortization, or use of such equipment.
(b) Vesting title under paragraph (a) of this clause is subject to civil rights legislation, 42 U.S.C. 2000d. Before title is vested and by signing this contract, the contractor accepts and agrees that—
“No person in the United States or its outlying areas shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under this contemplated financial assistance (title to equipment).”
(End of clause)
As prescribed in 45.302-7(e), insert the following clause:
Facilities Equipment Modernization (Apr 1985)
(a) The Contractor agrees to return to the Government the net cost savings realized from using modernized or replacement equipment provided by the Government under this contract. This applies to using such equipment on any contracts or subcontracts that are firm-fixed price, or that are fixed-price with economic price adjustment provisions, entered into within the 3 years following the date such equipment is placed into production. This provision does not apply to the use of such equipment in sealed bid contracts entered into after the equipment is placed in production or in contracts or subcontracts that specifically provide that they have been priced on the basis of anticipated use of such equipment.
(b)(1) The Contractor shall maintain adequate records for implementing this clause. The Contractor shall make such records available at its office for inspection, audit, or reproduction by any authorized representative of the Contracting Officer.
(2) When the Contractor authorizes a subcontractor to use the modernized or replacement equipment, the subcontractor shall be required to maintain records and make them and additional information available to the Contracting Officer.
(c) Records of equipment shall generally be acceptable if they are maintained under established accounting practices and permit a fair estimation of the net cost savings realized. Net cost savings realized shall be determined by a comparison of the Contractor’s cost experience in the operation of the equipment before and after modernization.
(d) Amounts due the Government under this clause shall be returned by the Contractor, as directed by the Contracting Officer, by—
(1) Credits to, or adjustment of the prices of, the related contracts benefitting from using the modernized or replacement equipment;
(2) Payment to the Government through the Contracting Officer having cognizance of the equipment; or
(3) Any other means mutually agreed to.
(End of clause)
As prescribed in 45.306-5, insert the following clause:
Special Tooling (May 2004)
(a) Definition.
“Special tooling” means jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and manufacturing aids, all components of these items, and replacements of these items that are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or performing particular services. It does not include material, special test equipment, facilities (except foundations and similar improvements necessary for installing special tooling), general or special machine tools, or similar capital items. Special tooling, for the purpose of this clause, includes all special tooling acquired or fabricated by the Contractor for the Government (other than special tooling to be delivered as a line item) or furnished by the Government for use in connection with and under the terms of the contract.
(b) Title. The Government retains title to Government-owned special tooling and option to take title to all special tooling subject to this clause until such time as title or option to take title is relinquished by the Contracting Officer as provided for in paragraphs (j)(2) and (j)(3) of this clause.
(c) Risk of loss. Except to the extent that the Government shall have otherwise assumed the risk of loss to special tooling applicable to this clause, in the event of the loss, theft or destruction of or damage to any such property, the repair or replacement shall be accomplished by the Contractor at its own expense.
(d) Special tooling furnished by the Government.
(1) Except as otherwise provided in this contract, all Government-furnished special tooling is provided “as is.” The Government makes no warranty whatsoever with respect to special tooling furnished “as is,” except that the property is in the same condition when placed at the f.o.b. point specified in the solicitation as when last available for inspection by the Contractor under the solicitation.
(2) The Contractor may repair any special tooling made available on an “as is” basis. Such repair will be at the Contractor’s expense, except as otherwise provided in this clause. Such property may be modified as necessary for use under this contract at the Contractor’s expense, except as otherwise directed by the Contracting Officer. Any repair or modification of property furnished “as is” shall not affect the title of the Government.
(3) If there is any change in the condition of special tooling furnished “as is” from the time inspected or last available for inspection under the solicitation to the time placed on board at the location specified in the solicitation or the Government directs a change in the quantity of special tooling furnished or to be furnished, and such change will adversely affect the Contractor, the Contractor shall, upon receipt of the property, notify the Contracting Officer detailing the facts, and, as directed by the Contracting Officer, either (i) return such items at the Government’s expense or otherwise dispose of the property, or (ii) effect repair to return the property to its condition when inspected under the solicitation or, if not inspected, last available for inspection under the solicitation. After completing the directed action and upon written request of the Contractor, the Contracting Officer shall equitably adjust any contractual provisions affected by the return, disposition, or repair in accordance with procedures provided for in the Changes clause of this contract. The foregoing provisions for adjustment are the exclusive remedy available to the Contractor, and the Government shall not be otherwise liable for any delivery of special tooling in a condition or in quantities other than that when originally offered.
(e) Use of special tooling. The Contractor may use special tooling subject to this clause on other Government effort when specifically approved in writing by the Contracting Officer for this contract and the Contracting Officer for the contract under which the special tooling will be used. Any other use of the special tooling shall be subject to advance written approval of the Contracting Officer. In the event the Government elects to remove any special tooling that is required for continued contract performance, the contract shall be equitably adjusted in accordance with paragraph (m) of this clause.
(f) Property control—
(1) Records. The Contractor’s special tooling records shall provide the following minimum information regarding each item of special tooling subject to this clause and shall be made available for Government inspection at all reasonable times:
(i) Number or code of the contract to which the tooling is accountable and the number or code of the contract for which the tooling was originally acquired or fabricated.
(ii) Retention codes as defined below:
(A) Primary Code. Assign one of the following to each item of special tooling:
Code A. Spares Tooling. Required to produce a provisioned spare part or assembly.
Code B. Judgment (Insurance) Tooling. Fabrication tools for parts that are not provisioned spares but which in the judgment of the Contractor will be required at some time for logistic support of the end item.
Code C. Rate Tooling. Necessary to economically produce at increased rates (e.g., for mobilization or surge) but not essential for parts fabrication at low production rates.
Code D. Assembly Tooling. Required for manufacture of the end product but not required for production of spare parts. Those items having no postproduction need except for potential modification or resumed production programs.
(B) Secondary Code. Assign one or more of the following codes, as applicable, to each item of special tooling:
Code 1. Repair Tooling. Items which are capable of being used for repair of provisioned parts or assemblies.
Code 2. Replaceable Tooling. Spares or judgment tooling (primary retention codes A or B) which, in the opinion of the Contractor, can be effectively and economically replaced by “soft” tooling on an “as required” basis in lieu of retention of the “hard” production tooling for supporting postproduction requirements.
Code 3. Maintenance Tooling. Items which are capable of being used for depot level maintenance of the applicable end item or components thereof.
Code 4. Crash Damage Tooling. Items which apply to provisioned or nonprovisioned parts or assemblies which are designated as or have the potential of being required for crash damage repairs.
(iii) Nomenclature, function, or comparable code.
(iv) Tool part number or code.
(v) Tool identification number, or quantity of each tool part number or code, if tool identification number is not assigned.
(vi) Part number(s) of item(s) on which used (complete hierarchy of part numbers).
(vii) Unit price. (Estimates are acceptable.)
(viii) Storage method code. Assign one of the following:
(ix) Estimated weight of tool, if over 25 pounds.
(x) Estimated volume of tool, if over 3 cubic feet.
(xi) Location of Contractor, subcontractor, vendor for each item. Use Federal Supply Code for Manufacturers (FSCM), or name and address if code is not available.
(xii) All operation sheets or other data as are necessary to show the manufacturing operation or processes for which such items were used, designed, or modified.
(2) Identification or tagging. To the extent practicable, the Contractor shall identify all special tooling subject to this clause in accordance with the Contractor’s identification procedures.
(g) Maintenance. The Contractor shall maintain special tooling in accordance with sound industrial practice. These requirements do not apply to those items designated by the Contracting Officer for disposal as scrap or identified as of no further interest to the Government under paragraph (j), Disposition instructions, of this clause.
(h) Identification of excess special tooling. The Contractor shall promptly identify and report all special tooling in excess of the amounts needed to complete full performance under this contract (see subdivision (i)(2)(i) of this clause).
(i) Lists of special tooling. The Contractor shall periodically prepare and distribute lists of special tooling as described below:
(1) Special tooling list. The list shall be furnished within 60 days after delivery of the first production end item under this contract or completion of the initial provisioning process, whichever is later, and shall include all special tooling subject to this clause as of the reporting date. However, if this contract represents the final production contract, the Contractor shall provide this list of all tools not later than 180 days prior to scheduled delivery of the last production end item. If this is a contract for storage of special tooling, the list shall be provided within 60 days of contract implementation.
(2) Excess special tooling list—
(i) Excess special tooling. Except for items subject to subdivision (i)(2)(ii) of this clause, lists of special tooling excess to this contract shall be furnished within 60 days of the date that the item is determined to be excess. The Contractor shall include in this list the information prescribed in Format of lists, paragraph (i)(3) of this clause, as well as the applicable excess code as follows:
Code V. Excess to contract requirements with no follow-on requirements.
Code W. Excess to contract requirements but can be used to support actual or anticipated follow-on requirements.
Code X. Excess due to changes in design or specification of the end items.
Code Y. Excess due to nonserviceable or nonrepairable condition.
Code Z. Other.
(ii) Termination inventory. The Contractor shall submit these items on an SF 1428 or by computer list attached to an SF 1428 in accordance with FAR 45.602-1. Format and content of this submission will be as prescribed by paragraph (i)(3) of this clause, but will contain information as prescribed by FAR Subpart 45.6, in effect on the date of award of this contract.
(3) Format of lists. Lists furnished by the Contractor shall state the type of list and shall include all information from paragraph (f)(1), Records, of this clause, items (i) through (xi). All lists will be grouped by primary retention code as prescribed in subdivision (f)(1)(ii)(A) of this clause and further listed in tool part number sequence.
(4) Distribution of lists. The Contractor shall submit two copies of lists to each of the following recipients unless otherwise directed:
(i) The Contracting Officer.
(ii) The Administrative Contracting Officer.
(iii) The inventory control point designated by the contracting office.
(j) Disposition instructions. The Contracting Officer shall provide the Contractor with written disposition instructions within 180 days of receipt of the list as prescribed by paragraph (i)(1) of this clause and within 90 days of the receipt of excess special tooling lists reported in accordance with paragraph (i)(2) of this clause. The Contracting Officer may direct disposition by any of the methods listed in paragraphs (j)(1) through (j)(3) of this clause, or a combination of such methods. The Contractor shall comply with such disposition instructions.
(1) The Contracting Officer may identify specific items of special tooling to be retained or give the Contractor a list specifying the products, parts, or services including follow-on requirements for which the Government may require special tooling and request the Contractor to identify all usable items of special tooling on hand that were designed for or used in the production or performance of such products, parts, or services. Once items of usable special tooling required by the Government are identified, the Contracting Officer may—
(i) Direct the Contractor to transfer specified items of special tooling to follow-on contracts requiring their use. Those items shall be furnished for use on the contract(s) as specified by the Contracting Officer and shall be subject to the provisions of the gaining contract(s); or
(ii) Request the Contractor to enter into an appropriate storage contract for special tooling specified to be retained by the Contractor for the Government. Tooling to be stored shall be stored pursuant to a storage contract between the Government and the Contractor; or
(iii) Direct the Contractor to transfer title to the Government (to the extent not previously transferred) and deliver to the Government those items of special tooling which are specified for removal from the Contractor’s plant.
(2) The Contracting Officer may direct the Contractor to sell, or dispose of as scrap, for the account of the Government, any special tooling not specified by the Government pursuant to paragraph (j)(1) of this clause. To the extent that the Contractor incurs any costs occasioned by compliance with such direction, for which it is not otherwise compensated, the contract price shall be equitably adjusted in accordance with the Changes clause of this contract. The net proceeds of all sales shall either be credited to the cost of contract performance or shall be otherwise paid to the Government as directed by the Contracting Officer. Sale of special tooling to the prime Contractor or any of its subcontractors is subject to the prior written approval of the Contracting Officer.
(3) The Contracting Officer may furnish the Contractor with a statement disclaiming further Government interest or right in specified special tooling.
(4) Restoration of Contractor's premises. Unless otherwise provided in this contract, the Government has no obligation to restore or rehabilitate the Contractor’s premises under any circumstances (e.g., abandonment, disposition upon completion of need, or upon contract completion). However, if special tooling is withdrawn or if other special tooling is substituted, then the equitable adjustment under paragraph (m) of this clause may properly include restoration or rehabilitation costs.
(k) Access to special tooling. The Contractor shall provide access to special tooling subject to this clause at all reasonable times to all individuals designated by the Contracting Officer.
(l) Storage or shipment. The Contractor shall promptly arrange for either the shipment or the storage of special tooling specified in accordance with the final disposition instructions in subdivisions (j)(1)(ii) or (j)(1)(iii) of this clause. Tooling to be shipped shall be properly packaged, packed, and marked in accordance with the directions of the Contracting Officer. All operation sheets or other appropriate data necessary to show the manufacturing operations or processes for which the items were used or designed shall accompany special tooling to be shipped or stored or shall otherwise be provided to the Government as directed by the Contracting Officer. To the extent that the Contractor incurs costs for storage, shipment, packing, crating, or handling under this paragraph and not otherwise compensated for, the contract price shall be equitably adjusted in accordance with the Changes clause of this contract.
(m) Equitable adjustment. When this clause specifies an equitable adjustment, it shall be made to any affected contract provision in accordance with the procedures of the Changes clause. When appropriate, the Contracting Officer may initiate an equitable adjustment in favor of the Government. The right to an equitable adjustment shall be the Contractor’s exclusive remedy. The Government shall not be liable to suit for breach of contract for—
(1) Any delay in delivery of Government-furnished special tooling;
(2) Delivery of Government-furnished special tooling in a condition not suitable for its intended use;
(3) A decrease in or substitution of special tooling; or
(4) Failure to repair or replace Government-furnished special tooling for which the Government is responsible.
(n) Subcontract provisions. In order to perform this contract, the Contractor may place subcontracts (including purchase orders) involving the use of special tooling. If the full cost of the tooling is charged to those subcontracts, the Contractor agrees to include in the subcontract appropriate provisions to obtain Government rights and data comparable to the rights of the Government under this clause (unless the Contractor and Contracting Officer agree in writing that such rights are not of interest to the Government). The Contractor agrees to exercise such rights for the benefit of the Government as directed by the Contracting Officer.
(End of clause)
As prescribed in 45.307-3, insert the following clause:
Special Test Equipment (Feb 1993)
(a) “Special test equipment,” as used in this clause, means either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment, including standard or general purpose items or components, that are interconnected and interdependent so as to become a new functional entity for special testing purposes. It does not include material, special tooling, facilities (except foundations and similar improvements necessary for installing special test equipment), and plant equipment items used for general plant testing purposes.
(b) The Contractor may either acquire or fabricate special test equipment at Government expense when the equipment is not otherwise itemized in this contract and the prior approval of the Contracting Officer has been obtained. The Contractor shall provide the Contracting Officer with a written notice, at least 30 days in advance, of the Contractor’s intention to acquire or fabricate the special test equipment. As a minimum, the notice shall also include an estimated aggregate cost of all items and components of the equipment the individual cost of which is less than $5,000, and the following information on each item or component of equipment costing $5,000 or more:
(1) The end use application and function of each proposed special test unit, identifying special characteristics and the reasons for the classification of the test unit as special test equipment.
(2) A complete description identifying the items to be acquired and the items to be fabricated by the Contractor.
(3) The estimated cost of the item of special test equipment or component.
(4) A statement that intra-plant screening of Contractor and Government-owned special test equipment and components has been accomplished and that none are available for use in performing this contract.
(c) The Government may furnish any special test equipment or components rather than approve their acquisition or fabrication by the Contractor. Such Government-furnished items shall be subject to the Government Property clause, except that the Government shall not be obligated to deliver such items any sooner than the Contractor could have acquired or fabricated them after expiration of the 30-day notice period in paragraph (b) of this clause. However, unless the Government notifies the Contractor of its decision to furnish the items within the 30-day notice period, the Contractor may proceed to acquire or fabricate the equipment or components subject to any other applicable provisions of this contract.
(d) The Contractor shall, in any subcontract that provides that special test equipment or components may be acquired or fabricated for the Government, insert provisions that conform substantially to the language of this clause, including this paragraph (d). The Contractor shall furnish the names of such subcontractors to the Contracting Officer.
(e) If an engineering change requires either the acquisition or fabrication of new special test equipment or substantial modification of existing special test equipment, the Contractor shall comply with paragraph (b) of this clause. In so complying, the Contractor shall identify the change order which requires the proposed acquisition, fabrication, or modification.
(End of clause)
As prescribed in 45.308-2, insert the following clause:
Government Property Furnished “As Is” (Apr 1984)
(a) The Government makes no warranty whatsoever with respect to Government property furnished “as is,” except that the property is in the same condition when placed at the f.o.b. point specified in the solicitation as when inspected by the Contractor pursuant to the solicitation or, if not inspected by the Contractor, as when last available for inspection under the solicitation.
(b) The Contractor may repair any property made available on an “as is” basis. Such repair will be at the Contractor’s expense except as otherwise provided in this clause. Such property may be modified at the Contractor’s expense, but only with the written permission of the Contracting Officer. Any repair or modification of property furnished “as is” shall not affect the title of the Government.
(c) If there is any change in the condition of Government property furnished “as is” from the time inspected or last available for inspection under the solicitation to the time placed on board at the location specified in the solicitation, and such change will adversely affect the Contractor, the Contractor shall, upon receipt of the property, notify the Contracting Officer detailing the facts and, as directed by the Contracting Officer, either (1) return such property at the Government’s expense or otherwise dispose of the property or (2) effect repairs to return the property to its condition when inspected under the solicitation or, if not inspected, last available for inspection under the solicitation. After completing the directed action and upon written request of the Contractor, the Contracting Officer shall equitably adjust any contractual provisions affected by the return, disposition, or repair in accordance with the procedures provided for in the Changes clause of this contract. The foregoing provisions for adjustment are the exclusive remedy available to the Contractor, and the Government shall not be otherwise liable for any delivery of Government property furnished “as is” in a condition other than that in which it was originally offered.
(d) Except as otherwise provided in this clause, Government property furnished “as is” shall be governed by the Government Property clause of this contract.
(End of clause)
![]() ![]() |